Plumbing Quiz Phase 3 C&G - CW. HW, Sanitation & Rainwater Recap

Plumbing Quiz Phase 3 C&G - CW. HW, Sanitation & Rainwater Recap

12th Grade

23 Qs

quiz-placeholder

Similar activities

Adobe Illustrator. Edit and File review.

Adobe Illustrator. Edit and File review.

9th - 12th Grade

20 Qs

Contrat travail, emploi et société

Contrat travail, emploi et société

1st - 12th Grade

20 Qs

cool movies

cool movies

4th - 12th Grade

20 Qs

On tap may tang am va may thu thanh

On tap may tang am va may thu thanh

12th Grade

20 Qs

Quiz de villanos en el cine

Quiz de villanos en el cine

KG - Professional Development

20 Qs

ADUM 21

ADUM 21

12th Grade

20 Qs

The Grand IPL Auction Round 1

The Grand IPL Auction Round 1

9th - 12th Grade

20 Qs

SOAL UJIAN SEMESTER GENAP KELAS X

SOAL UJIAN SEMESTER GENAP KELAS X

9th - 12th Grade

20 Qs

Plumbing Quiz Phase 3 C&G - CW. HW, Sanitation & Rainwater Recap

Plumbing Quiz Phase 3 C&G - CW. HW, Sanitation & Rainwater Recap

Assessment

Quiz

Other

12th Grade

Practice Problem

Medium

Created by

Nico Pigan

Used 11+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

23 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How can the cold water supply pressure to a property be identified?

By contacting the local council or using a weir gauge at the kitchen sink

By contacting the local council or using a pressure gauge at the supply to the FOV

By contacting the water undertaker or using a pressure gauge at the cistern-fed outlets

By contacting the water undertaker or using a pressure gauge at the kitchen sink

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What term is given to the length of pipe when all fittings and components are considered during pipe sizing?

Equivalent length

Actual length

Mean length

Velocity length

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the recommended storage capacity of a CWSC supplying cold and hot water to a house?

100 litres minimum

150 litres minimum

230 litres minimum

350 litres minimum

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following factors would not directly affect the pressure and flow rates of pipework?

Pipe diameter

Pipe material

Number of bends

pH level of the water supply

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A boosted cold water system is fitted with a break cistern at low level and a storage cistern at high level. The pump seems to have seized after 'running dry' for some time. What control component within the system is most likely to have failed and allowed this to happen?

Float operated valve within the storage cistern

Float operated level shut-off switch within the storage cistern

Float operated valve within the break cistern

Float operated low level shut-off switch within the break cistern

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How often should a CWSC be checked for contamination and general condition within an apartment block?

Monthly

Quarterly

Half yearly

Annually

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A sentinel outlet may be described as:

a tap at the mid-position within a system

the taps at the furthest and closest locations to the supply

the taps at the highest and lowest points

A tap outlet which is operated the least frequently

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?