EV Charging PEI/ Vehicle as Storage

EV Charging PEI/ Vehicle as Storage

1st - 12th Grade

12 Qs

quiz-placeholder

Similar activities

Digital Data Storage Quiz

Digital Data Storage Quiz

9th Grade - University

15 Qs

Ground Fault Circuit Interrupting Device

Ground Fault Circuit Interrupting Device

12th Grade

15 Qs

Video File Management

Video File Management

10th - 12th Grade

10 Qs

FUENTES LINEALES

FUENTES LINEALES

1st Grade

13 Qs

Hospitality and Catering All units (Quiz 1)

Hospitality and Catering All units (Quiz 1)

9th - 12th Grade

13 Qs

Ren-SCADATEL dan Catu Daya

Ren-SCADATEL dan Catu Daya

1st - 12th Grade

10 Qs

Environmental Technologies

Environmental Technologies

1st - 3rd Grade

10 Qs

Electric Tech Review

Electric Tech Review

7th Grade

11 Qs

EV Charging PEI/ Vehicle as Storage

EV Charging PEI/ Vehicle as Storage

Assessment

Quiz

Specialty

1st - 12th Grade

Hard

Created by

Darren Pigott

Used 1+ times

FREE Resource

12 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The general term, which encapsulates and covers all methods for vehicle as storage is abbreviated to..

V2G

V2H

V2X

V2D

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The abbreviation V2X covers..

V2G

V2H

V2G + V2H

V2G + V2D

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

EESS is an abbreviation of

Electrical energy storage system

Energy & Electrical systems for storage

Electrical equipment storage system

Equipment for electrical systems used as storage

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Where on isolator does not disconnect all live parts in a dwelling, the multiple isolators are required to..

be interlocked

have warning notices

be local to each other

disconnect line conductors

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

PCE is an abbreviation of

Parallel circuits of energy

Vehicle power converting equipment

Parallel converting equipment

Parallel combined equipment

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When installing a V2X system you must

inform the car manufacturer

inform the ENA

inform the competent person scheme

register with Part P

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Electrical considerations for parallel operation may not include..

Compatability of RCDs with the inverter

The earthing arrangement

inverter effects on overload protection for Dis Bds

ratings of components to enable potentially higher currents

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?