8202L3SANPPT3

8202L3SANPPT3

12th Grade

44 Qs

quiz-placeholder

Similar activities

Architects and their works for Orientation 1

Architects and their works for Orientation 1

12th Grade

48 Qs

Utilitas Bangunan Rumah Tinggal 2 plumbing myfile 4.

Utilitas Bangunan Rumah Tinggal 2 plumbing myfile 4.

9th - 12th Grade

40 Qs

ARCHITECTURAL NOCTI REVIEW - 3

ARCHITECTURAL NOCTI REVIEW - 3

9th - 12th Grade

45 Qs

General Aptitude for Architecture orientation 2

General Aptitude for Architecture orientation 2

12th Grade

45 Qs

Architectural Drawing

Architectural Drawing

12th Grade - University

40 Qs

CAD - Chapter 20 Wall Construction

CAD - Chapter 20 Wall Construction

12th Grade

49 Qs

Lesson 2: review

Lesson 2: review

12th Grade

40 Qs

Greek mythology

Greek mythology

KG - Professional Development

40 Qs

8202L3SANPPT3

8202L3SANPPT3

Assessment

Quiz

Architecture

12th Grade

Hard

Created by

William Heron

FREE Resource

44 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is another name for a cesspool?

Septic system

Off mains

Cesspit

Treatment plant

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In what type of areas are many homes and villages likely to use a cesspool, septic tank, or treatment plant instead of a public sewer system?

Urban areas

Coastal areas

Rural areas

Industrial areas

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main characteristic of a cesspool's design in terms of pipework?

It has multiple inlet and outlet pipes.

It has no outlet pipework.

It has a complex network of pipes.

It is connected to the public sewer system.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What material are modern cesspools commonly made from?

Brick

Concrete

Glass reinforced plastic (GRP)

Steel

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why must cesspools be constructed to be watertight?

To prevent the leakage of any foul water or the ingress of surrounding groundwater.

To allow for easier cleaning and maintenance.

To prevent the sewage from freezing in cold temperatures.

To make them easier to transport and install.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a common problem that may arise with cesspools that necessitates them being emptied on a regular basis?

Increase in beneficial bacteria

Overflow of effluent

Improved drainage efficiency

Decrease in maintenance costs

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who is responsible for carrying out the process of emptying cesspools?

A plumbing inspector

A drainage contractor

The homeowner

A municipal worker

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?