9189PH1CHPPT3

9189PH1CHPPT3

12th Grade

46 Qs

quiz-placeholder

Similar activities

Pemesanan dan Perhitungan Tarif Penerbangan

Pemesanan dan Perhitungan Tarif Penerbangan

12th Grade

48 Qs

Found. of Tech/Engineer. 2022 FINAL Exam-chps. 7,8,11 & choice

Found. of Tech/Engineer. 2022 FINAL Exam-chps. 7,8,11 & choice

9th - 12th Grade

50 Qs

AOS_2024_Tema2_Evaluacion_Individual

AOS_2024_Tema2_Evaluacion_Individual

9th - 12th Grade

45 Qs

Mechanical Technical

Mechanical Technical

12th Grade

48 Qs

9189PH1CHPPT3

9189PH1CHPPT3

Assessment

Quiz

Architecture

12th Grade

Practice Problem

Hard

Created by

William Heron

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

46 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

What components are more commonly included in modern system boilers?

Thermostat, timer, and pressure relief valve

Circulator, automatic bypass, and an expansion vessel

Heat exchanger, pilot light, and flue

Burner, control panel, and safety valve

2.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

What is the advantage of installing a system boiler?

It is more energy-efficient than other boilers.

It saves time and space on the installation.

It can operate without electricity.

It provides instant hot water.

3.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

When is a system boiler the preferred choice?

When a non-sealed system is required

When a sealed system is required

When the lowest cost option is needed

When the highest capacity is needed

4.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

What is the purpose of a sealed expansion vessel in a sealed system?

To replace the feed and expansion cistern of the open system

To provide a point at which the system can be filled under mains pressure

To prevent the over-pressurisation of the system if the expansion vessel fails

To incorporate a number of components to replace the feed and expansion cistern, cold feed and open vent

5.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

What is the function of a pressure relief valve (blow off) in a sealed system?

To replace the feed and expansion cistern

To allow the system to be filled under mains pressure

To prevent the over-pressurisation of the system if the expansion vessel fails

To incorporate components to replace the vent system

6.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

What is the purpose of installing a filling connection with a detachable filling loop in a sealed system?

To replace the feed and expansion cistern

To provide a point at which the system can be filled under mains pressure

To prevent the over-pressurisation of the system

To replace the vent systems seen previously

7.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

What needs to be installed to prevent the possibility of back siphonage of central heating water into mains water?

A) A single check valve

B) A pressure relief valve

C) A double check valve

D) A thermostatic mixing valve

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?