1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
1 What type of foundation is this?
A Raft
B Wide Strip
C Pile
D Narrow Strip
Answer explanation
The correct type of foundation is a Narrow Strip, as indicated in the answer choices. This type of foundation is commonly used in construction projects.
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
2 What processes are these images showing?
A Pad
B Narrow Strip
C Stepped Foundation
D Pile
Answer explanation
The correct choice is D. The images are showing the process of Pile foundation construction.
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
3 In the construction of a new residential building, which one of the following is not typically considered a necessary utility service?
D Wi-Fi
C Drainage
B Electric
A Water
Answer explanation
In the construction of a new residential building, Wi-Fi is not typically considered a necessary utility service, unlike water, electric, and drainage.
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
During the construction of a residential house, what is the term used for the gap left between the brickwork and blockwork for insulation purposes?
A Middle
B Space
C Cavity
D Gap
Answer explanation
The term used for the gap left between the brickwork and blockwork for insulation purposes is 'Cavity'.
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
During the construction of a new residential building, the architect specifies a particular type of floor construction. Which type is it?
A Solid concrete floor.
B Suspended floor
C Concrete Screed
D Block and beam floor
Answer explanation
The correct type of floor construction specified by the architect for the new residential building is a Block and beam floor.
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
During the construction of a new residential building, who would be responsible for determining the depth of concrete required for the foundations and floor?
A Quantity Surveyor
B Structural Engineer
C Architect
D Site Surveyor
Answer explanation
The Structural Engineer would be responsible for determining the depth of concrete required for the foundations and floor.
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What name is given to the floor construction that is not fixed?
A Suspended
B Temporary
C Solid
D Floating
Answer explanation
The correct name given to the floor construction that is not fixed is 'Floating', making option D the correct choice.
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?