Construction materials and methods.

Construction materials and methods.

12th Grade

41 Qs

quiz-placeholder

Similar activities

Roads of the U.S.

Roads of the U.S.

6th - 12th Grade

36 Qs

Intro to Philosophy to the Human Person

Intro to Philosophy to the Human Person

12th Grade

40 Qs

Architectural Drawing

Architectural Drawing

12th Grade - University

40 Qs

Lesson 2: review

Lesson 2: review

12th Grade

40 Qs

seni rupa kls 8C 2024

seni rupa kls 8C 2024

8th Grade - University

45 Qs

Safety and Health Quiz

Safety and Health Quiz

12th Grade

39 Qs

UTS FIKIH KELAS VII

UTS FIKIH KELAS VII

12th Grade - University

40 Qs

M4 Principles of Site & Building Layout Trade Terms 38

M4 Principles of Site & Building Layout Trade Terms 38

9th - 12th Grade

38 Qs

Construction materials and methods.

Construction materials and methods.

Assessment

Quiz

Architecture

12th Grade

Easy

Created by

Conrad Wheeler

Used 20+ times

FREE Resource

41 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

1 What type of foundation is this?

A          Raft

B          Wide Strip

C          Pile

D          Narrow Strip

Answer explanation

The correct type of foundation is a Narrow Strip, as indicated in the answer choices. This type of foundation is commonly used in construction projects.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

 

2 What processes are these images showing?

A              Pad

B              Narrow Strip

C     Stepped Foundation

D              Pile

Answer explanation

The correct choice is D. The images are showing the process of Pile foundation construction.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

3 In the construction of a new residential building, which one of the following is not typically considered a necessary utility service?

D           Wi-Fi

C           Drainage

B           Electric

A           Water

Answer explanation

In the construction of a new residential building, Wi-Fi is not typically considered a necessary utility service, unlike water, electric, and drainage.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

During the construction of a residential house, what is the term used for the gap left between the brickwork and blockwork for insulation purposes?

A        Middle

B        Space

C       Cavity

D       Gap

Answer explanation

The term used for the gap left between the brickwork and blockwork for insulation purposes is 'Cavity'.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

During the construction of a new residential building, the architect specifies a particular type of floor construction. Which type is it?

 

A  Solid concrete floor.

B  Suspended floor

C       Concrete Screed

D  Block and beam floor

Answer explanation

The correct type of floor construction specified by the architect for the new residential building is a Block and beam floor.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

During the construction of a new residential building, who would be responsible for determining the depth of concrete required for the foundations and floor?

A           Quantity Surveyor

B           Structural Engineer

C           Architect

D           Site Surveyor

Answer explanation

The Structural Engineer would be responsible for determining the depth of concrete required for the foundations and floor.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What name is given to the floor construction that is not fixed?

 

A        Suspended

B        Temporary

C          Solid

D         Floating

Answer explanation

The correct name given to the floor construction that is not fixed is 'Floating', making option D the correct choice.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?