1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the size range of the flexible lecture theatre mentioned in the client's brief established in November 2018?
1000-2000m²
2500-3000m²
3500-4000m²
2000-2500m²
Answer explanation
The size range of the flexible lecture theatre mentioned in the client's brief established in November 2018 is 2500-3000m², as per the correct answer choice provided.
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the seating capacity of the open plan spaces as per the client's brief?
200 persons per room
300 persons per room
400 persons per room
500 persons per room
Answer explanation
The correct seating capacity of the open plan spaces as per the client's brief is 500 persons per room.
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following features is required for the building according to the client's brief?
High energy consumption
Difficult to upgrade
Aesthetically pleasing and blending into surroundings
Fixed deadline of December 2019
Answer explanation
The correct choice is 'Aesthetically pleasing and blending into surroundings' as it aligns with the client's brief for the building.
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
By when is the deadline for the project completion firmly fixed as per the client's brief?
November 2018
November 2019
November 2020
November 2021
Answer explanation
The deadline for the project completion firmly fixed as per the client's brief is November 2019, as stated in the client's brief.
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What kind of procurement process is mentioned in the client's brief?
Complex and lengthy
Moderate and reasonable
Simple and speedy
Detailed and slow
Answer explanation
The correct answer is 'Simple and speedy' because the client's brief mentions a procurement process that is straightforward and quick.
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
At which RIBA stage should you engage with your modular contractor to get the most from a modular solution?
RIBA stage 0
RIBA stage 1 or 2
RIBA stage 3
After construction has started
Answer explanation
Engaging with your modular contractor at RIBA stage 1 or 2 allows for the most benefit from a modular solution by incorporating their expertise early in the design process.
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What are the benefits of designing a building around the modular system?
Reduced design flexibility
Increased construction time
Improved value for money and reduced programme time
Decreased construction efficiencies
Answer explanation
Designing a building around the modular system offers improved value for money and reduced programme time, making it a cost-effective and efficient choice.
Create a free account and access millions of resources
Similar Resources on Wayground
39 questions
two step equation

Quiz
•
7th Grade - University
45 questions
Algebra 2

Quiz
•
8th Grade
44 questions
LGS İngilizce. Unit 10.Natural Forces Vocabulary 2ED

Quiz
•
8th Grade
37 questions
Ulangan Harian PJOK

Quiz
•
8th Grade
44 questions
El verbo

Quiz
•
8th Grade
45 questions
Sem 2 Exam Review General Math Unit 2

Quiz
•
8th - 9th Grade
40 questions
ACAP Voc List 2/8

Quiz
•
8th Grade - University
40 questions
8th grade Vocabulary- Chorus

Quiz
•
8th Grade
Popular Resources on Wayground
10 questions
Lab Safety Procedures and Guidelines

Interactive video
•
6th - 10th Grade
10 questions
Nouns, nouns, nouns

Quiz
•
3rd Grade
10 questions
9/11 Experience and Reflections

Interactive video
•
10th - 12th Grade
25 questions
Multiplication Facts

Quiz
•
5th Grade
11 questions
All about me

Quiz
•
Professional Development
22 questions
Adding Integers

Quiz
•
6th Grade
15 questions
Subtracting Integers

Quiz
•
7th Grade
9 questions
Tips & Tricks

Lesson
•
6th - 8th Grade