What is the size range of the flexible lecture theatre mentioned in the client's brief established in November 2018?
Client's Brief Quiz

Quiz
•
Education
•
8th Grade
•
Hard

Robert Cogbill
FREE Resource
42 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
1000-2000m²
2500-3000m²
3500-4000m²
2000-2500m²
Answer explanation
The size range of the flexible lecture theatre mentioned in the client's brief established in November 2018 is 2500-3000m², as per the correct answer choice provided.
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the seating capacity of the open plan spaces as per the client's brief?
200 persons per room
300 persons per room
400 persons per room
500 persons per room
Answer explanation
The correct seating capacity of the open plan spaces as per the client's brief is 500 persons per room.
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following features is required for the building according to the client's brief?
High energy consumption
Difficult to upgrade
Aesthetically pleasing and blending into surroundings
Fixed deadline of December 2019
Answer explanation
The correct choice is 'Aesthetically pleasing and blending into surroundings' as it aligns with the client's brief for the building.
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
By when is the deadline for the project completion firmly fixed as per the client's brief?
November 2018
November 2019
November 2020
November 2021
Answer explanation
The deadline for the project completion firmly fixed as per the client's brief is November 2019, as stated in the client's brief.
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What kind of procurement process is mentioned in the client's brief?
Complex and lengthy
Moderate and reasonable
Simple and speedy
Detailed and slow
Answer explanation
The correct answer is 'Simple and speedy' because the client's brief mentions a procurement process that is straightforward and quick.
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
At which RIBA stage should you engage with your modular contractor to get the most from a modular solution?
RIBA stage 0
RIBA stage 1 or 2
RIBA stage 3
After construction has started
Answer explanation
Engaging with your modular contractor at RIBA stage 1 or 2 allows for the most benefit from a modular solution by incorporating their expertise early in the design process.
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What are the benefits of designing a building around the modular system?
Reduced design flexibility
Increased construction time
Improved value for money and reduced programme time
Decreased construction efficiencies
Answer explanation
Designing a building around the modular system offers improved value for money and reduced programme time, making it a cost-effective and efficient choice.
Create a free account and access millions of resources
Similar Resources on Wayground
45 questions
Coronavirus quiz

Quiz
•
7th Grade - University
45 questions
Teks eksposisi tentang corona

Quiz
•
8th Grade
42 questions
History of MCSHS

Quiz
•
7th - 12th Grade
37 questions
Unit 3 Weeks 5&6 (5th and 6th Grade

Quiz
•
6th Grade - University
40 questions
Spelling Test #1 Level 1D

Quiz
•
4th Grade - University
39 questions
World of Food

Quiz
•
8th Grade - Professio...
40 questions
TEST SUMATIV

Quiz
•
7th - 8th Grade
40 questions
TRIAL SPM 2020 (Miri, Sarawak)

Quiz
•
1st - 12th Grade
Popular Resources on Wayground
25 questions
Equations of Circles

Quiz
•
10th - 11th Grade
30 questions
Week 5 Memory Builder 1 (Multiplication and Division Facts)

Quiz
•
9th Grade
33 questions
Unit 3 Summative - Summer School: Immune System

Quiz
•
10th Grade
10 questions
Writing and Identifying Ratios Practice

Quiz
•
5th - 6th Grade
36 questions
Prime and Composite Numbers

Quiz
•
5th Grade
14 questions
Exterior and Interior angles of Polygons

Quiz
•
8th Grade
37 questions
Camp Re-cap Week 1 (no regression)

Quiz
•
9th - 12th Grade
46 questions
Biology Semester 1 Review

Quiz
•
10th Grade