GMJ 7202 Unit 112 Questions (part 2)

GMJ 7202 Unit 112 Questions (part 2)

Professional Development

9 Qs

quiz-placeholder

Similar activities

Risk Assessments in Building Service Engineering PT4

Risk Assessments in Building Service Engineering PT4

Professional Development

10 Qs

M7.19 Lightning Strikes and HIRF Cat B1/B2 V7.01

M7.19 Lightning Strikes and HIRF Cat B1/B2 V7.01

Professional Development

11 Qs

Unit 307 session 7a Cold water storage cistern quiz

Unit 307 session 7a Cold water storage cistern quiz

Professional Development

8 Qs

Enlisted Ranks Of The US NAVY

Enlisted Ranks Of The US NAVY

Professional Development

13 Qs

GMJ 6035 Hot water worksheet 4 - maintenance

GMJ 6035 Hot water worksheet 4 - maintenance

Professional Development

11 Qs

Emoji test

Emoji test

KG - Professional Development

13 Qs

Disney TV Shows and Movies

Disney TV Shows and Movies

KG - Professional Development

11 Qs

POST TEST

POST TEST

Professional Development

10 Qs

GMJ 7202 Unit 112 Questions (part 2)

GMJ 7202 Unit 112 Questions (part 2)

Assessment

Quiz

Other

Professional Development

Medium

Created by

Glen Johnson

Used 23+ times

FREE Resource

9 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Fault finding: Link the symptoms to the cause.....

Humming /squealing noise when tap is opened.

Caused by worn or split washer in float operated valve.

Caused by loose or incorrectly supported / clipped pipework.

Caused by worn or split tap washer.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Fault finding: Link the symptoms to the cause.....

Loud / violent banging within the system.

Caused by worn or split washer in float operated valve.

Caused by loose or incorrectly supported / clipped pipework.

Caused by worn or split tap washer.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Fault finding: Link the symptoms to the cause.....

Loud hum in pipework.

Caused by worn or split washer in float operated valve.

Caused by loose or incorrectly supported / clipped pipework.

Caused by worn or split tap washer.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Fault finding: Link the fault to the solution.....

Worn or split tap washer.

Identify loose pipework and fix in place.

Renew tap washer.

Renew washer in float operated valve.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Fault finding: Link the fault to the solution.....

Worn or split washer in float operated valve.

Identify loose pipework and fix in place.

Renew tap washer.

Renew washer in float operated valve.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Fault finding: Link the fault to the solution.....

Loose or incorrectly supported / clipped pipework.

Identify loose pipework and fix in place.

Renew tap washer.

Renew washer in float operated valve.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is ‘planned’ preventative maintenance?

Working on breakdowns and emergencies.

Regular checking of taps, valves and appliances.

A 24 hour call out service.

The installation of hot and cold services.

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is ‘unplanned’ maintenance?

Working on breakdowns and emergencies

Regular checking of taps, valves and appliances

The installation of hot and cold services

Yearly gas boiler service

9.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is it important to carry out maintenance speedily and efficiently?

To ensure you get paid as soon as possible.

To get the system working as soon as possible

To ensure the job costs the customer less

To ensure you finish work on time.