Unit 6 lesson 6: BS1192 Naming Convention Quiz

Unit 6 lesson 6: BS1192 Naming Convention Quiz

12th Grade

50 Qs

quiz-placeholder

Similar activities

SRHS Parent Night 2019

SRHS Parent Night 2019

10th - 12th Grade

46 Qs

2nd Semester Examining the Teaching Profession Review

2nd Semester Examining the Teaching Profession Review

10th - 12th Grade

53 Qs

Building Laws Preboard 2 of 2

Building Laws Preboard 2 of 2

KG - Professional Development

50 Qs

Quiz 1 (Chapter 1: Ethics and Professionalism)

Quiz 1 (Chapter 1: Ethics and Professionalism)

12th Grade

54 Qs

MIT App Inventor  Quiz  Hard Level

MIT App Inventor Quiz Hard Level

3rd - 12th Grade

50 Qs

WCM Chapter 2

WCM Chapter 2

12th Grade

52 Qs

HTML And CSS

HTML And CSS

4th Grade - Professional Development

53 Qs

Python Quiz

Python Quiz

12th Grade

50 Qs

Unit 6 lesson 6: BS1192 Naming Convention Quiz

Unit 6 lesson 6: BS1192 Naming Convention Quiz

Assessment

Quiz

Professional Development

12th Grade

Hard

Created by

Miles Tarplee

Used 1+ times

FREE Resource

50 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of the BS1192 naming convention according to the text?

To provide a 'best practice' guide for naming documents, drawings, models, and data files.

To establish a new software for building information modelling.

To replace the building information modelling (BIM) process.

To create a job listing platform for architecture, engineering, and construction.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

BS1192 is a part of which process?

Building information modelling (BIM)

Architectural design process

Construction site management

Engineering education curriculum

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does using BS1192 ensure in the context of architecture, engineering, and construction?

It ensures that all buildings are constructed with the same materials.

It ensures that everyone understands what something is and who has done it, from job to job.

It ensures that all construction projects are completed within budget.

It ensures that all engineers and architects receive the same education.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of translating the codes used by the BS1192 system?

To simplify the complexity of the system

To create a new coding system

To encrypt the information further

To comply with international standards

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT a category explained in the BS1192 codes?

Project

Originator

Color schemes

File type, role, classification, number, revision

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How many characters should the 'Project' field contain according to the given coding structure?

1-2 characters

2-6 characters

3-6 characters

4 integer numeric digits

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Is the 'Classification' field required or optional?

Required

Optional

Not mentioned

1 character

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?