1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

  1. The British Standard for the design of water based heating systems is:

b. BS EN 12828
a. BS 6700
c. BS EN 12058
d. BS 9001

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

  1. The conservation of fuel and energy is covered by which approved document?

a. Building Regulations part A
c. Building Regulations part Q
d. Building Regulations part L.
b. Building Regulations part K

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

  1. Describe what the main purpose of a central heating system is:

To increase humidity in a property
To provide cooling in a property
To reduce noise in a property
To provide thermal comfort in a property

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

  1. Describe some of the key differences between a low pressure open vented system and a pressurised sealed system.

The key differences between a low pressure open vented system and a pressurised sealed system are the water source (cistern vs. mains supply) and the method of maintaining pressure (gravity vs. sealed vessel).

HIGH pressure systems: These are fed from a feed and expansion cistern located at high level. These can be HALF pumped or gravity systems.

high pressure systems: These are fed from a feed and expansion cistern located at low level. These can be fully pumped or gravity systems.

High pressure vs. low pressure

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

  1. Describe the primary function of the open vent on a central heating system.

controls the temperature of the water
used to increase system pressure
aesthetic feature for the system
safety outlet, if system overheat, atmospheric pressure.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

  1. According to British Standards, what must not be installed on the open vent pipework?

Valves.
Fittings
Gauges
Pipes

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

  1. Identify the pipe that should be connected to this air

separator at point A.

Secondary air supply pipe
Main air supply pipe
Water supply pipe

The flow to the system

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?