2018 IPC CH 9A Quiz

2018 IPC CH 9A Quiz

Professional Development

25 Qs

quiz-placeholder

Similar activities

2018 IPC CH 10 Study Quiz

2018 IPC CH 10 Study Quiz

Professional Development

25 Qs

PPCE1

PPCE1

University - Professional Development

20 Qs

2018 IPC CH 5 Study Quiz

2018 IPC CH 5 Study Quiz

Professional Development

25 Qs

2018 Mechanical Chapter 13

2018 Mechanical Chapter 13

Professional Development

25 Qs

Premier League

Premier League

Professional Development

20 Qs

Chapter 4: Fixture Controls

Chapter 4: Fixture Controls

Professional Development

25 Qs

2018 IPC CH 7A Study Quiz

2018 IPC CH 7A Study Quiz

Professional Development

25 Qs

2018 IPC CH 9A Quiz

2018 IPC CH 9A Quiz

Assessment

Quiz

Other

Professional Development

Medium

Created by

Johnny Thulin

Used 4+ times

FREE Resource

25 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

01. The main purpose of venting is for __________.
a. exhaust of sewer gases
b. trap seal protection
c. decreasing flow rates
1.       d. increasing flow rates

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

02. A vent piping system is necessary to prevent pressure differentials of more than __________ against the trap seal of any fixture.
a. 1 inch of water column
b. 1 foot of head
c. 1 PSI
2.       d. 0.433 PSI

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

03. The vent system for a chemical waste system must __________.
a. connect to the sanitary vent system above the highest fixture
b. terminate through a wall to the outdoors
c. be independent of the sanitary vent system
3.       d. terminate in a stack-type air admittance valve

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

04. Prefabricated lead flashings for vent pipe penetrations must have a sheet weight of not less than __________ pounds per square foot.
a. 3.5
b. 2.5
c. 1.25
4.       d. 0.75

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

05. In a sanitary drainage system, what is the minimum number of vent pipes that are required to extend to the outdoors?
a. one
b. two
c. one for each air admittance valve
5.       d. one for each vent stack or stack vent

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

06. A vent stack connection to the base of a stack is required to connect__________.
a. above the lowest horizontal branch
b. to the building drain
c. at or below the lowest horizontal branch
6.       d. a minimum of 10 pipe diameters away from the stack

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

07. Where required to be protected against frost closure, the vent extension through the roof shall be not less than __________ inches in diameter beginning not less than __________ inches inside the thermal envelope.
a. 4, 12
b. 3, 12
c. 3, 18
7.       d. 4, 6

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?