
9189PH3HWPPT3

Quiz
•
Architecture
•
12th Grade
•
Hard

William Heron
FREE Resource
40 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Why is testing and commissioning a hot water system considered important?
It is a legal requirement.
It proves the correct and effective operation of the system.
It is only necessary for large systems.
It is a manufacturer's preference.
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What must the system comply with during testing and commissioning?
Only the manufacturer’s instructions.
Only the regulations.
Both the manufacturer’s instructions and the regulations.
The personal preferences of the technician.
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the outcome of correct commissioning and set-up of a hot water system?
It guarantees the system will never need repairs.
It ensures the system meets aesthetic standards.
It makes the system work to the specification or fail to meet the requirements.
It increases the energy consumption of the system.
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What can incorrect commissioning, system flushing, system set-up, and poor maintenance lead to in a plumbing and domestic heating system?
Improved system performance
Decreased energy costs
System's performance issues and health implications
Faster water heating
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following documents is NOT mentioned as one to be followed for testing and commissioning in plumbing and domestic heating?
The Water Supply (Water Fittings) Regulations
BSEN806 (and BS8558)
Approved Document G3
The Plumbing and Heating Installation Manual
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
During a visual inspection of a plumbing system, what should be inspected regarding the expansion vessel?
Check the color of the expansion vessel.
Check the pre-charge in the expansion vessel if not required.
Check the pre-charge in the expansion vessel if required.
Check the expansion vessel for decorative purposes.
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Why should the system be filled in stages during the initial fill process?
To allow the cistern to fill to capacity
To ensure maximum pressure
To allow checks for leaks
To ensure the correct operation of valves
Create a free account and access millions of resources
Similar Resources on Wayground
Popular Resources on Wayground
10 questions
Video Games

Quiz
•
6th - 12th Grade
10 questions
Lab Safety Procedures and Guidelines

Interactive video
•
6th - 10th Grade
25 questions
Multiplication Facts

Quiz
•
5th Grade
10 questions
UPDATED FOREST Kindness 9-22

Lesson
•
9th - 12th Grade
22 questions
Adding Integers

Quiz
•
6th Grade
15 questions
Subtracting Integers

Quiz
•
7th Grade
20 questions
US Constitution Quiz

Quiz
•
11th Grade
10 questions
Exploring Digital Citizenship Essentials

Interactive video
•
6th - 10th Grade
Discover more resources for Architecture
10 questions
Video Games

Quiz
•
6th - 12th Grade
10 questions
UPDATED FOREST Kindness 9-22

Lesson
•
9th - 12th Grade
6 questions
Rule of Law

Quiz
•
6th - 12th Grade
15 questions
ACT Math Practice Test

Quiz
•
9th - 12th Grade
18 questions
Hispanic Heritage Month

Quiz
•
KG - 12th Grade
28 questions
Ser vs estar

Quiz
•
9th - 12th Grade
10 questions
Would you rather...

Quiz
•
KG - University
13 questions
BizInnovator Startup - Experience and Overview

Quiz
•
9th - 12th Grade