ISYS6338003 - Pre Test

ISYS6338003 - Pre Test

University

10 Qs

quiz-placeholder

Similar activities

Chapter 3 Static Testing

Chapter 3 Static Testing

ISTQB - Section 3

ISTQB - Section 3

ISTQB Foundation 5

ISTQB Foundation 5

ISQTB

ISQTB

Testing

Testing

ISTQB FOUNDATION

ISTQB FOUNDATION

Pre test on Assessments

Pre test on Assessments

ISYS6338003 - Pre Test

ISYS6338003 - Pre Test

Assessment

Quiz

Education

University

Practice Problem

Hard

Created by

nur anisa

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

There are two types of testing, namely static testing and dynamic testing.

TRUE

FALSE

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Choose one of the correct statements below:

A defect is a mistake made by a human being (for example in writing code)

A failure is when the system or component does not perform as it should (for example returns the wrong balance)

An error is when the system or component does not perform as it should (for example returns the wrong balance)

An error is something that is wrong (for example in the code itself)

3.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

This type of static testing in which a work product or process is evaluated by one or more individuals to detect issues and to provide improvements is referred to....

Plan

Analyze

Test Execution

Review

4.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

There are two types of reviews in testing, namely....

Static and Dynamic Reviews

Systematic and Non-Systematic Reviews

Formal and Informal Reviews

Direct and Indirect Reviews

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Reorder the main activities of the review process below:

1.Initiate Review

2.Individual Review

  1. 3.Fixing & Reporting

4.Issue Communication & Analysis

5.Planning

5-1-2-3-4

1-2-3-4-5

5-4-3-2-1

5-2-1-3-4

5-1-3-4-2

6.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

  1. - Reviewing all or part of the work documents(s)

  2. - Noting potential defects, recommendations and questions

    The Foundation Syllabus specifies above activities in the process of....

Planning

Individual Review

Initiate Review

Fixing & Reporting

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

There are 3 severity classes, namely critical, minor and major. Defect that can cause downstream effects, for example fault in a design can result in an error in its implementation is referred to as....

Critical

Minor

Major

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?