Project Master

Project Master

Professional Development

•

50 Qs

quiz-placeholder

Similar activities

Youth Meeting - 6 September

Youth Meeting - 6 September

1st Grade - Professional Development

•

50 Qs

IT SUPPORT (MUBY)

IT SUPPORT (MUBY)

Professional Development

•

50 Qs

AI+ Prompt Engineering Level 1 Exam(Sorted By Modules)

AI+ Prompt Engineering Level 1 Exam(Sorted By Modules)

Professional Development

•

50 Qs

Sizing Quiz

Sizing Quiz

Professional Development

•

50 Qs

Rooftop FO - Vie

Rooftop FO - Vie

Professional Development

•

53 Qs

Performance Check ATC Mopah

Performance Check ATC Mopah

Professional Development

•

50 Qs

ENDO-RENAL QUIZIZZIT

ENDO-RENAL QUIZIZZIT

University - Professional Development

•

55 Qs

PERFORMANCE CHECK APP NOVEMBER 2023

PERFORMANCE CHECK APP NOVEMBER 2023

Professional Development

•

45 Qs

Project Master

Project Master

Assessment

Quiz

•

Specialty

•

Professional Development

•

Practice Problem

•

Hard

Created by

Joanna D.

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

50 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

You are project manager of a project. During the process of selecting the sellers, you reject one vendor because it doesn't have the manufacturing capability. This is an example of which selection tool?

Weighting system
Screening system
Seller rating system
Expert judgment

2.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

What provides details about how the project scope may be changed?

Control Scope system
VeiirV Scope
Scope Charter
Scope Management plan

3.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Which of the following technique to identify the underlying cause of a problem and take steps to prevent further occurrence?

Root cause analysis
Quality audits
Project audits
Risk audits

4.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Which of the following provides the least accurate in estimating?

Rough order of magnitude
Budget estimate
WBS estimate
Definitive estimate

5.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Who has the responsibility for informing the final deliverable to all stakeholders?

Project Manager
Sponsor
Team Lead
Management

6.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

What is a corrective action?

An action that brings future project events Into alignment with the project plan
An action to correct something in the project
An action to prevent something in the project
Corrective action is not related to project

7.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Assumptions are factors that, for planning purposes, are considered to be …

True, real, or certain
True, real, or uncertain
Real
Verbal

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?