electrical mock Quiz part 2

electrical mock Quiz part 2

University

59 Qs

quiz-placeholder

Similar activities

LABORATORY MANAGEMENT PRELIM EXAM

LABORATORY MANAGEMENT PRELIM EXAM

University - Professional Development

55 Qs

EXAM OF UNIT 1 LEVELS OF ORGANISATION OF HUMAN BEINGS

EXAM OF UNIT 1 LEVELS OF ORGANISATION OF HUMAN BEINGS

University

55 Qs

Post Operative Management

Post Operative Management

University

64 Qs

Biologia molecular

Biologia molecular

University

58 Qs

El Sistema Solar

El Sistema Solar

1st Grade - University

60 Qs

Pengujian dan standarisasi bahan teknik

Pengujian dan standarisasi bahan teknik

University

60 Qs

Preliminary examination

Preliminary examination

University

54 Qs

Secondary treatment

Secondary treatment

University

56 Qs

electrical mock Quiz part 2

electrical mock Quiz part 2

Assessment

Quiz

Science

University

Practice Problem

Hard

Created by

John Shermer

Used 3+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

59 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is a risk assessment carried out?

To make sure work is completed quickly.

To make sure work is carried out safely.

To make sure all PPE is always worn.

To make sure BS 7671 is followed when working.

Answer explanation

A risk assessment is carried out to ensure work is carried out safely, not necessarily quickly or following specific regulations like BS 7671 or always wearing PPE.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the most appropriate procedure for dealing with a request to clean a light fitting that is attached to a suspected asbestos insulating board?

Refuse, unless specific training has been given.

Use a damp, lint-free cleaning cloth to contain the dust.

Use an appropriate vacuum cleaner to remove any dust.

Refuse, unless planning permission has been granted.

Answer explanation

The most appropriate procedure is to refuse the request unless specific training has been given due to the potential risk of asbestos exposure.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What asbestos survey type must take place before an office block, constructed in the 1960s, is totally refurbished?

Type 1.

Type 2.

Type 3.

Type 4.

Answer explanation

An asbestos Type 3 survey is required before refurbishing a 1960s office block to identify all asbestos-containing materials in the building.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the correct colour of a 230 V extension lead used on a construction site?

Red.

Yellow.

Blue.

Violet.

Answer explanation

The correct colour of a 230 V extension lead used on a construction site is blue, as per safety standards and regulations.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the role of an architect?

To meet the needs of the quantity surveyor.

To meet the needs of the clerk of works.

To meet the needs of the site manager.

To meet the needs of the customer.

Answer explanation

The role of an architect is to meet the needs of the customer, ensuring that their requirements and vision are translated into the design and construction process.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which industry organisation represents the interests of consumer?

Electrical Safety First.

Joint Industries Board.

JT Ltd.

UNITE.

Answer explanation

The correct industry organisation that represents the interests of consumers is the Joint Industries Board.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What defines Current?

The flow of electrons in a given time.

The energy consumed by a resistance.

The force opposing the flow of electricity.

The force pushing the flow of electricity

Answer explanation

The correct choice defines Current as the flow of electrons in a given time.

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?