Industrialised Building System (IBS)

Industrialised Building System (IBS)

University

10 Qs

quiz-placeholder

Similar activities

EEACT

EEACT

University

10 Qs

Theories of Learning

Theories of Learning

University - Professional Development

8 Qs

1.02 My Friends ~ Listening Quizizz

1.02 My Friends ~ Listening Quizizz

University

10 Qs

MSE_Module-1.3

MSE_Module-1.3

University

8 Qs

BAHAN BINAAN BERINDUSTRI

BAHAN BINAAN BERINDUSTRI

2nd Grade - University

10 Qs

Unit 202: quiz 7 working at height Safety at Height Quiz

Unit 202: quiz 7 working at height Safety at Height Quiz

11th Grade - University

15 Qs

TOEFL Structure (Skill 37-38)

TOEFL Structure (Skill 37-38)

9th Grade - Professional Development

10 Qs

Who Can Help Me?

Who Can Help Me?

University

12 Qs

Industrialised Building System (IBS)

Industrialised Building System (IBS)

Assessment

Quiz

Education

University

Medium

Created by

AMIRUL (POLIMAS)

Used 2+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What does IBS stand for in the context of construction?


  • A) Industrialized Building System


  • B) Integrated Building Systems


  • C) Innovative Building Standards


  • D) Interlocking Brick Systems


2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which of the following best describes IBS?


  • A) A construction method that relies solely on in-situ construction techniques.


  • B) A system that emphasizes traditional building methods.


  • C) A building system involving industrialized production and mechanical assembly of building components.


  • D) A technique that emphasizes manual labor for construction.


3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the primary objective of IBS?


  • A) To increase in-situ construction processes.


  • B) To decrease the efficiency of construction projects.


  • C) To reduce reliance on mechanical means.


  • D) To minimize in-situ construction and maximize the use of prefabricated components.


4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which of the following is NOT a characteristic of IBS?


  • A) Industrialized production of building elements.


  • B) Mechanical assembly of building components.


  • C) Heavy reliance on traditional construction methods.


  • D) Minimal in-situ construction.


5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which of the following is NOT a component of IBS based on structural aspects?

A) Pre-cast Concrete Framing, Panel & Box Systems

B) Steel/Metal Formwork Systems

C) Brick and Mortar Systems

D) Prefabricated Timber Framing Systems


6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which component of IBS involves the use of pre-cast concrete elements for framing, panels, and boxes?

A) Steel Framing Systems

B) Blockwork Systems

C) Pre-cast Concrete Framing, Panel & Box Systems

D) Steel/Metal Formwork Systems


7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What type of framing system in IBS involves the use of steel or metal components?

A) Pre-cast Concrete Framing, Panel & Box Systems

B) Steel/Metal Formwork Systems

C) Prefabricated Timber Framing Systems

D) Blockwork Systems


Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?