HIgher - Development Methodologies

HIgher - Development Methodologies

11th Grade

73 Qs

quiz-placeholder

Similar activities

Linux - Unit 5 Review

Linux - Unit 5 Review

9th - 12th Grade

72 Qs

DATA OPERATIONS TEST

DATA OPERATIONS TEST

10th - 11th Grade

70 Qs

PLTW IED Sem 1 Review

PLTW IED Sem 1 Review

9th - 12th Grade

72 Qs

J277 OCR CS GCSE - Primary and Secondary Storage

J277 OCR CS GCSE - Primary and Secondary Storage

9th - 12th Grade

78 Qs

networking conceots

networking conceots

8th Grade - University

78 Qs

PBS SAINS KOMPUTER T4 - 1.6 Struktur Data dan Modular

PBS SAINS KOMPUTER T4 - 1.6 Struktur Data dan Modular

10th - 12th Grade

70 Qs

IT Fundamentals practice exam II

IT Fundamentals practice exam II

11th Grade

77 Qs

IT fundamentals Practice quiz 1

IT fundamentals Practice quiz 1

11th Grade

76 Qs

HIgher - Development Methodologies

HIgher - Development Methodologies

Assessment

Quiz

Computers

11th Grade

Practice Problem

Hard

Created by

Jack Walker

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

73 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which stage of the software development process is missing? Analysis, Design, Testing, Documentation, Evaluation, Maintenance

Fixing

Implementation

Re-analysis

Specification

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

During the design stage, which of the following would not be done?

Wireframing a user interface.

Creating a structure diagram of the program modules.

Agreeing the functional requirements with the users.

Deciding on variables and arrays required to store data.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the traditional software development process often called?

Agile model

V-model

Waterfall model

Spiral model

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why has the waterfall model evolved over time?

To increase the complexity of applications

To reduce the time and money spent creating and maintaining applications

To make the process less structured

To decrease software quality

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What characteristic of the traditional software development process makes it an iterative process?

Constant revision and evaluation at every phase

Lack of documentation

Single phase development

No team collaboration

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What ensures quality and efficiency in the final product of the traditional software development process?

The complexity of the applications

The iterative nature of the process

The use of a single developer

The reduction of team collaboration

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of following the traditional software development process as far as possible in large scale commercial software projects?

To create a successful product

To complicate the development process

To reduce the need for maintenance

To avoid documentation

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?