Progression hot water revision 1

Progression hot water revision 1

University

25 Qs

quiz-placeholder

Similar activities

NFPA 13: Finding the section and answer

NFPA 13: Finding the section and answer

University

25 Qs

TOWHAUL T756 pretest

TOWHAUL T756 pretest

University

30 Qs

1.11 Piping and Instrumentation

1.11 Piping and Instrumentation

University

26 Qs

T Level BSE industrial heating

T Level BSE industrial heating

12th Grade - University

22 Qs

Gen_Tech_FoP_Quiz2

Gen_Tech_FoP_Quiz2

12th Grade - Professional Development

30 Qs

HYD PPD KMO

HYD PPD KMO

1st Grade - University

20 Qs

PMI 2024 week 6

PMI 2024 week 6

University

20 Qs

Dishwashers

Dishwashers

University

24 Qs

Progression hot water revision 1

Progression hot water revision 1

Assessment

Quiz

Professional Development

University

Medium

Created by

Plumbers Cymoedd

Used 3+ times

FREE Resource

25 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following pieces of information will be provided by the installation plan?

The dwelling position on the estate

The expected completion date

The order in which work should take place

The position of the hot water pipes and valves in a dwelling

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The water supply (water fittings) regulations 1999 lay down:

The regulations covering all internal and external hot and cold water systems for dwellings

The guidance for good practice when installing hot and cold pipework in a dwelling

The regulations that cover hot water systems only

The guidance for internal hot and cold water systems only within a dwelling

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following hot water components should be fixed using flexible connections?

Indirect hot water cylinder

Shower mixer valve

Booster pump for a shower

External bib tap

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A rigid pipework hot water system has a working pressure of 4bar. At what pressure should the pipework be tested for soundness?

1bar for 60 minutes

1½ times the working pressure for 15 minutes

6bar for one hour

4bar for 30mins then 6bar for 15 minutes

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

To prevent electrolytic corrosion taking place in a system, where can the magnesium rod be placed?

The cold water storage cistern

The hot water cylinder

The circulator

The open vent

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Guidance on the installation procedures for domestic hot water systems can be found in:

Domestic Water Act 2007

Specification of work

BS6700

Local Authority Regulations

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In a customer's property, the CWSC supplies both the hot and cold water systems. The minimum size of this cistern is:

Equal to 48 hours' worth of water

230 litres

100 litres

Twice the size of the domestic hot water cylinder.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?