Final Test for market launch of EQS

Final Test for market launch of EQS

Professional Development

11 Qs

quiz-placeholder

Similar activities

WCS 1105-3 - Knowledge Assessment

WCS 1105-3 - Knowledge Assessment

Professional Development

10 Qs

2.1 - 2.7 Quiz

2.1 - 2.7 Quiz

Professional Development

11 Qs

vinfast

vinfast

Professional Development

15 Qs

Kursus Hybrid KKKB (Safety)

Kursus Hybrid KKKB (Safety)

Professional Development

10 Qs

DC regulated Power Supply

DC regulated Power Supply

Professional Development

10 Qs

F023 TAv07 - the lot

F023 TAv07 - the lot

Professional Development

16 Qs

Automotive stuff

Automotive stuff

5th Grade - Professional Development

11 Qs

SJIT ECE- ELECTRONICS OBJECTIVE TEST-2 @ 26/8/21

SJIT ECE- ELECTRONICS OBJECTIVE TEST-2 @ 26/8/21

Professional Development

10 Qs

Final Test for market launch of EQS

Final Test for market launch of EQS

Assessment

Quiz

Other

Professional Development

Hard

Created by

Atef Abdel-Hady

FREE Resource

11 questions

Show all answers

1.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

Which statement(s) about the components of the EQS is/are correct?

The DC/DC converter supplies the 12 V on-board electrical system with voltage.

The vehicle interior is heated by the high-voltage PTC heater integrated in the air conditioner housing.

The charging plug detection function of the on-board charger prevents driving off with the charging cable plugged in.

As with the other model series, the interlock signal is monitored in the BMS control unit.

The DC/DC converter control unit forms the interface between low-voltage and high-voltage on-board electrical system.

2.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

Which statement(s) about the on-board electrical system (low-voltage and high-voltage) of the EQS is/are correct?

The power supply in the EQS is provided via the high-voltage on-board electrical system with high-voltage battery and via the 12 V on-board electrical system with 12 V on-board electrical system battery.

A 12 V lithium-ion battery is used in the EQS.

The EQS is the first vehicle to use a 48 V on-board electrical system in addition to the high-voltage on-board electrical system.

The 12 V on-board electrical system is supplied with energy from the high-voltage on-board electrical system with the aid of the DC/DC converter.

All control units used in the EQS are supplied via the 12 V on-board electrical system battery.

3.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

Which statement(s) about the high-voltage interlock circuit of the EQS is/are correct?

The EQS again uses the familiar central interlock system.

The EQS is the first model in the EVA 2 architecture to use a new decentralized interlock system.

The advantage of the decentralized interlock system is that each component is monitored independently, which simplifies diagnosis in the event of damage.

All high-voltage components report the interlock status to the central powertrain control unit via a communication bus.

Due to the new architecture, an interlock function is no longer necessary.

4.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

Which statement(s) about charging in the EQS (V297 model series) is/are correct?

There is an AC charger with 22 kW charging capacity as special equipment.

The basic charger in ECE markets is an AC charger with 11 kW charging capacity.

The maximum charging capacity for DC charging is 120 kW.

There is an AC charger with 60 kW charging capacity as special equipment.

The maximum charging capacity for DC charging is 180 or 200 kW depending on the type of battery installed.

5.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

Which statement(s) about thermal management in EQS is/are correct?

The thermal management system consists of a low-temperature and a high-temperature cooling circuit.

The thermal management system consists of two low-temperature cooling circuits.

The NT1 cooling circuit contains the DC/DC converter, the electric machines with power electronics and the chargers.

The NT2 cooling circuit contains the high-voltage battery and a high-voltage PTC heater (5.2 kW).

Coupled with the NT1 cooling circuit is the passenger compartment heating circuit with integrated 8 kW high-voltage PTC heater.

6.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

Which statement(s) about the high-voltage battery in the EQS (V297 model series) is/are correct?

The high-voltage battery is located in the trunk.

The high-voltage battery is located in the vehicle floor.

The instrument cluster indicates whether the high-voltage battery is safe for transport.

Two different battery sizes of the high-voltage battery are available for the EQS.

The lithium-ion battery contains the cells, the battery management system and the high-voltage contactors.

7.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

Which statement(s) about the recuperation of the EQS is/are correct?

During recuperation, kinetic energy is converted into electrical energy.

The strength of the recuperation process can be set using paddle shifters on the steering wheel.

The recuperation performance may be significantly reduced after and during a ESP regulation.

Recuperation level 'D+' corresponds to no recuperation. (Sailing)

The recuperation performance does not depend on the state of charge of the high-voltage battery.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?