Construction and Building  Planning research activity

Construction and Building Planning research activity

12th Grade

69 Qs

quiz-placeholder

Similar activities

NC Test Prep Unit II - Broker Supervision & Compensation (S)

NC Test Prep Unit II - Broker Supervision & Compensation (S)

12th Grade

66 Qs

Yr9 Assessment Point 1

Yr9 Assessment Point 1

12th Grade

66 Qs

LET 3 SEMESTER 1 REVIEW

LET 3 SEMESTER 1 REVIEW

9th - 12th Grade

66 Qs

WCM Chapter 1

WCM Chapter 1

12th Grade

71 Qs

Statutory Designations for Land and Water Areas

Statutory Designations for Land and Water Areas

12th Grade

65 Qs

Comptia A+ 1102 "Command Line"

Comptia A+ 1102 "Command Line"

12th Grade

69 Qs

FCCLA Study Guide

FCCLA Study Guide

9th - 12th Grade

74 Qs

PPSC Headmaster Exam Sample Questions

PPSC Headmaster Exam Sample Questions

12th Grade

69 Qs

Construction and Building  Planning research activity

Construction and Building Planning research activity

Assessment

Passage

Professional Development

12th Grade

Hard

Created by

Miles Tarplee

FREE Resource

69 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What must be completed to the clients' requirements before any building work can start?

Risk assessments

Programmes Of Work

Site layouts

Planning to ensure the work is completed within the timescale and budgets agreed

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does planning a construction or building services project include?

Writing Programmes Of Work and method statements

Organising suppliers and subcontractors

Planning site layouts and equipment hire

All of the above

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the phrase that encapsulates the importance of planning and preparation in construction?

The 4 Cs of Construction

The 6 Ps

The 5 Rs of Responsibility

The 3 Ts of Teamwork

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does the acronym '6 Ps' stand for in the context of project planning?

Proper Planning and Preparation Prevents Poor Performance

Precise Procedures and Processes Promote Peak Performance

Professional Planning and Practice Prevents Problems

Prior Planning and Preparation Prevents Potential Problems

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does site analysis involve before formulating any design according to the learning material?

Checking the legal documentation

Conducting soil tests

Surveying the land and measuring its features

Evaluating the economic viability of the project

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT a factor to consider in site analysis as per the document?

Size

Location

Color of the soil

Current and proposed characteristics

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

According to the document, what should be carefully researched before any design is formulated?

The proposed site

The construction materials

The local wildlife

The weather patterns

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?