1.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

The reactor vessel internal component(s) that carries the entire weight of the core and other internals is/are the:

Core Support Lugs

Core Shrouds

Upper Guide Structure

Core Support Barrel

2.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

In the RVLMS indications, the top of the hot leg is between lights...

#3 and #4

#4 and #5

#5 and #6

#6 and #7

3.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

The plant is at full power

A Loss of Offsite Power occurs

All equipment responds as expected

The Pressurizer level lowers to 34%

Subsequently, the Pressurizer level recovers to 40%. At that point, assuming NO operator action, which banks of Pressurizer heaters are energized?

Heaters powered from LCC-15 ONLY

No heaters are energized

Heaters powered from LCC-15 AND LCC-16

Heaters powered from LCC-16 ONLY

4.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

What is a consequence of energizing C-150A, Aux Hot Shutdown Panel, with SS-TAVE, Ave Temp Display Select, in the "LOOP 1 TAVE" position?

P-8B, Steam Drive Aux Feed Pump, receives a start signal

Atmospheric Steam Dump Valves get a quick open signal

PCS Loop 2B WR Tcold TI-0125C fails low on C-150A

Atmospheric Steam Dump Valves fail closed

5.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

At what temperature is LTOP required to be in service and what is the PORV pressure relief path?

<= 430°F

Quench Tank

<=430°F

Primary System Drain Tank

<=460°F

Primary System Drain Tank

<=460°F

Quench Tank

6.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Which set of temperature readings represents a set of conditions where the reactor must be tripped?

Lower Seal = 170°F with no CCW cooling available

Two seal stages failed

P-50B vibrations = 20 mils

Upper Thrust Bearing = 180°F with no CCW cooling available

One seal stage failed

P-50B vibrations = 25 mils

Upper Guide Bearing = 180°F with no CCW cooling available

One seal stage failed

P-50B vibrations = 20 mils

Lower Guide Bearing = 180°F with no CCW cooling available

Two seal stage failed

P-50B vibrations = 25 mils

7.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

The plant is at full power

The VCT level is initially 55% and Charging Pump suction is in its normal lineup

During a transient, the VCT level lowers to 5% and then subsequently recovers to 25%

Assuming that all automatic actions occurred as expected, What is the current alignment of following valves that provide suction to the Charging Pumps?

MO-2087, VCT Outlet

MO-2160, SIRW Outlet

MO-2087 is open

MO-2160 is open

MO-2087 is closed

MO-2160 is open

MO-2087 is closed

MO-2160 is closed

MO-2087 is open

MO-2160 is closed

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?