
TWR TYPE C PC SMT 1 2024
Authored by PCSMT1 2024
Other
Professional Development
Used 2+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
50 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
15 mins • 1 pt
The following is not the phraseology for preparation for take off:
2.
MULTIPLE CHOICE QUESTION
15 mins • 1 pt
What is the holding pattern aircraft arrival Rwy 04 from Namrole
3.
MULTIPLE CHOICE QUESTION
15 mins • 1 pt
Additional operating hours after 17.00 WIT (08.00 UTC) can be done if there is a written request from the airline/operator to the General Ambon Manager no later than .... hours before operational hours end and carried out on the orders and approval of the General Manager or Appointed official. Meanwhile, Air Traffic Services are carried out earlier than operating hours can be done no later than ..... hours before operating hours at start (based on SOP)
4.
MULTIPLE CHOICE QUESTION
15 mins • 1 pt
Procedures for damage to facilities are as follows: (except)
5.
MULTIPLE CHOICE QUESTION
15 mins • 1 pt
Aerodrome elevation is the elevation of the highest point of the landing area. The height of aerodrome elevation at pattimura ambon airport is...
6.
MULTIPLE CHOICE QUESTION
15 mins • 1 pt
Determining the runway must be in accordance with wind speed and wind direction. Changes in runway can be caused by except
7.
MULTIPLE CHOICE QUESTION
15 mins • 1 pt
The point at which an aircraft is granted an air traffic control clearance is …
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Microsoft
or continue with
%20(1).png)
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?