1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

Choose correct answer for a, b, c, d & e

a. Architect,

b. Traffic Engineer,

c. Project Manager,

d. Site workers

e. Subcontractor

a. Consultants,

b. Architect,

c. Clerk of works,

d. Subcontractors,

e. Suppliers

a. Consultants,

b. Architect,

c. Clerk of works,

d. Suppliers

e. Subcontractors

a. Consultants,

b. Architects ,

c. Suppliers,

d. Project Manager,

e. Subcontractors

2.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Select THREE (3) roles & responsibilities of ARCHITECT.

employed by client to design & coordinate the project

to prepare the architectural drawings complete with plans & specifications

to coordinate the construction program & resources

Supervising & inspecting the building works during construction

3.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Select THREE (3) roles & responsibilities of Mechanical & Electrical (M&E) Engineer.

to ensure compliance work according to main contractor approval

to advise on the M&E services for the design building

to prepare technical drawings of electrical layout, piping and other related services

supervising & inspecting the M&E works during construction

4.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Select TWO (2) roles & responsibilities of Clerk of Works (COW).

to ensure compliance of construction works with construction drawings

to ensure compliance of construction works with client's requirement

to undertake the construction of building

to represent the architect & engineer on construction site on supervision work

5.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Select THREE (3) roles & responsibilities of Quantity Surveyor (QS).

To coordinate construction program base on the costing.

To prepare the tender and contract documents.

To prepare the Bills of Quantities (BQ) based on

the construction drawings.

To advise on the costs and financial viability of

different construction methods and materials.

6.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Select TWO (2) roles & responsibilities of the Main Contractor.

To prepare site possession based on architect's drawing

To undertake the construction of building.

To coordinate construction programs and

resources (labor, plant, and materials) with the

architect, sub-contractors, and suppliers.

To coordinate construction programs &

resources (labor, plant & materials) with the

architect, and sub-contractors

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Select ONE (1) role & responsibilities of the Supplier.

To undertake specialist works, e.g. M&E works.

Provide quality products or services on time, Maintain good communication with the buyer, Resolve any issues or disputes promptly

To supply and deliver building materials, plant

and equipment.

provide resolution of issues or disputes regarding installation item at site

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?