07 Electrical System

07 Electrical System

Professional Development

14 Qs

quiz-placeholder

Similar activities

145-S26-Week 7 Quiz 1

145-S26-Week 7 Quiz 1

Professional Development

10 Qs

Pra RIR Starting Motor <150KVA

Pra RIR Starting Motor <150KVA

Professional Development

15 Qs

CPL Acft Tech - Electrical systems

CPL Acft Tech - Electrical systems

Professional Development

15 Qs

OSDA ELECTRICAL..

OSDA ELECTRICAL..

Professional Development

14 Qs

Preventive Maintenance PC Small

Preventive Maintenance PC Small

Professional Development

15 Qs

HVAC Electrical

HVAC Electrical

Professional Development

11 Qs

MELAKUKAN PERAWATAN INSTRUMEN KELISTRIKAN

MELAKUKAN PERAWATAN INSTRUMEN KELISTRIKAN

Professional Development

10 Qs

SCANIA_REPAIR ELECTRIC COMPONENT

SCANIA_REPAIR ELECTRIC COMPONENT

Professional Development

15 Qs

07 Electrical System

07 Electrical System

Assessment

Quiz

Other

Professional Development

Hard

Created by

Thiago Lopes

FREE Resource

14 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Compared with the current flow through the starter circuit, which connects the battery to the starter motor, the current flow through the starter switch in the start position is:

Much higher.

The same.

Much lower.

Alternating.

2.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

A fully charged battery:-

Is capable of supplying the total electrical load of an aircraft for one hour or more.

Has an electrolyte with a specific gravity of 1.3.

Will have an off load voltage of 2.0 Volts per cell.

Will never fail.

3.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Connecting two 12 volt, 40 ampere-hour, capacity batteries in series will provide a battery of:

12 volts and 80 ampere-hours capacity.

24 volts and 40 ampere-hours capacity.

24 volts and 80 ampere-hours capacity.

12 volts and 40 ampere hours capacity.

4.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

A fully charged lead acid battery has a specific gravity of approximately:

1.350

2.275

1.170

1.300

5.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

A 100 Ampere-Hour battery:

Will, in theory, supply 20 Amps for up to 5 hours.

Must be used in parallel with another similar battery.

Supplies the bus-bars through a 45 Ampere circuit breaker.

Takes 100 hours to charge.

6.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

If a fuse blows during flight it:

Should not be replaced until after landing.

May be replaced in the air once only, by one of the same value.

May be replaced by a fuse of a higher rating to ensure that it will not blow again.

May be replaced as often as required.

7.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

In the event of an alternator or generator failure during flight the:

Flight may be continued normally because the battery supplies all electrical loads.

Electrical loads should be reduced to a minimum and a landing made as soon as safely practicable.

Alternator master switch should be turned off and flight continued normally without electrical power.

Battery master switch should be turned off and flight continued normally without electrical power.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?