Search Header Logo

6035 Site Prep Quiz 1

Authored by Ben Ashford

Other

12th Grade

Used 13+ times

6035 Site Prep Quiz 1
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

42 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who should be informed when a plumbing operative identifies that the wrong bathroom suite items have been delivered to site?

Clerk of Works.

Building control officer.

Supervisor.

Quantity surveyor.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The location of second fix sanitary ware in a new hotel development can be found in the:

Building Regulations.

Work programme.

Job specification.

Installation plan.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be the first action before carrying out work in an occupied dwelling?

Protect the immediate work area with sheets provided by the employer, and then commence the work.

Inspect the working area and report any existing defects or damage to the customer.

Confirm that the customer has adequate house contents insurance just in case of any damage.

Remove footwear before entering the property, then place dust sheets in the work area.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

After upgrading the heating controls to an existing system, which one of the following actions should be taken with the customer?

Leave all material receipts, a breakdown of labour costs and the final invoice with the customer.

Take installation instructions for safekeeping and advise customer to make contact if required.

Hand over all instructions and take time to explain the operation of the system and controls.

Contact a Corgi inspector and arrange for them to visit site in order to issue a completion certificate.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What documentation is used for making an official alteration to a contract specification?

Variation order.

Requisition order.

Bill of quantities.

Advice note.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The most secure method, and best practice for storing ceramic WC pans on site before installation is to:

Cover the pans in plastic sheets in an outside area to save on internal storage space

Cover the pans with protective packaging, and stack to a safe height in a locked store

Stack each pan no more than one high and cover with insulation to protect from frost attack

Remove the packaging, and then stack the pans to ceiling height to maximise use of storage space.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Before materials and equipment can be obtained at a merchant’s on account, the merchant will require a company:

Invoice

Letterhead

Bill of quantities

Purchase order.

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?