
TM expert ISTQB.org
Authored by Nhung Dương
Other
Professional Development
Used 3+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
20 questions
Show all answers
1.
FILL IN THE BLANKS QUESTION
1 min • 1 pt
Câu 1: [Scenario 1] Trang 4/30
Answer explanation
Đáp án: A, D, F
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Câu 2: [Scenario 1] Trang 6/30
A. Indicators i, ii and v should be used.
B. Indicators i, ii, iii and v should be used.
C. All of these indicators should be used.
D. Indicators i, ii, iv, v, and vi should be used.
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Câu 3: [Scenario 1] Trang 7/30
A. Metrics i, ii, iii, v and vi will be required.
B. All of these metrics will be required.
C. Metrics ii, iii, iv, v and vi will be required.
D. Metrics i, iii, v, vi and vii will be required.
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A. Options i, iii and iv are correct.
B. Options ii, iii and iv are correct.
C. All the options are correct.
D. Options ii, iv and v are correct.
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Câu 6: Which one of the following is a characteristic normally associated with agile projects?
A. The testers are integrated into the project from the initiation of the project.
B. The development specifications corresponding to the delivered functionality are as complete (i.e., they won’t be added to later) as they would be in the V-model.
C. The testers focus primarily on integration testing.
D. When the schedule is compressed, testing planned for later iterations will be reduced or eliminated.
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A. Adjust the existing test estimates for i. All others should be monitored by project management.
B. Set triggers for i, iii, iv, v. Initiate control measures for vi. Monitor ii.
C. Monitor i, ii, iii. Set a trigger date for iv. Initiate control measures for v. Adjust the existing test estimates for vi.
D. Ignore i and ii as those are issues for the development team. Adjust existing test estimates for iv, v, vi. Transfer iii to the business team.
7.
MULTIPLE SELECT QUESTION
45 sec • 1 pt
Câu 8: Which of the following is true regarding the Test Manager’s role in change management? (pick two)
A. The Test Manager should be involved in impact analysis even when the proposed change is not expected to affect the schedule.
B. The Test Manager should require documentation for any change proposed for an agile project.
C. The Test Manager should not attend impact analysis sessions as it will tend to discourage others from speaking and participating.
D. The Test Manager’s role in change management is not restricted to the testing aspects of the project.
E. The Test Manager is responsible for the change management process.
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?