3 Phase Circuit Isolation Procedure

3 Phase Circuit Isolation Procedure

Professional Development

15 Qs

quiz-placeholder

Similar activities

DC regulated Power Supply

DC regulated Power Supply

Professional Development

10 Qs

Outcome 4 Safe working procedures during fault finding.

Outcome 4 Safe working procedures during fault finding.

Professional Development

20 Qs

SJIT ECE- ELECTRONICS OBJECTIVE TEST-2 @ 26/8/21

SJIT ECE- ELECTRONICS OBJECTIVE TEST-2 @ 26/8/21

Professional Development

10 Qs

18th edition part 2 mock 3

18th edition part 2 mock 3

Professional Development

10 Qs

 Test de connaissances en électricité

Test de connaissances en électricité

Professional Development

20 Qs

2.1 - 2.7 Quiz

2.1 - 2.7 Quiz

Professional Development

11 Qs

Body System Diagnosis Phase 1 (LV2)

Body System Diagnosis Phase 1 (LV2)

Professional Development

20 Qs

F023 TAv 07 KLP 07.01.05-08

F023 TAv 07 KLP 07.01.05-08

Professional Development

11 Qs

3 Phase Circuit Isolation Procedure

3 Phase Circuit Isolation Procedure

Assessment

Quiz

Other

Professional Development

Hard

Created by

Mark Gogerty

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step in the safe isolation procedure of a 3-phase circuit?

Locking out the circuit

Identifying the main switch

Testing for voltage presence

Applying warning tags

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is used to ensure that a circuit remains de-energized during maintenance?

Warning tag

Voltage tester

Lockout device

PPE

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be done to verify that the circuit is completely de-energized before starting work?

Apply a warning tag

Test for voltage presence

Lock out the circuit

Identify the main switch

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which type of Personal Protective Equipment (PPE) is most critical when performing electrical work on a 3-phase circuit?

Safety goggles

Insulated gloves

Steel-toed boots

Hard hat

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of applying warning tags during the isolation of a 3-phase circuit?

To lock the circuit

To test the equipment

To alert others that work is being performed

To identify the main switch

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Before using a voltage tester on a circuit, what is an important step to ensure safety and accuracy?

Locking out the circuit

Checking the tester on a known live source

Applying warning tags

Wearing PPE

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is it necessary to gain permission before isolating a 3-phase circuit?

To ensure that no critical processes are interrupted

To apply warning tags

To check the functionality of test equipment

To identify the main switch

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?