Commissioning plumbing systems

Commissioning plumbing systems

11th Grade

34 Qs

quiz-placeholder

Similar activities

Fronts Review!!

Fronts Review!!

9th - 12th Grade

30 Qs

Providing First Aid for Specific Injuries & Sudden Illness

Providing First Aid for Specific Injuries & Sudden Illness

9th - 12th Grade

32 Qs

Objective 4.0- Water Conservation Study Guide

Objective 4.0- Water Conservation Study Guide

9th - 12th Grade

38 Qs

ES Final Exam Review

ES Final Exam Review

10th - 12th Grade

35 Qs

integumentary

integumentary

11th - 12th Grade

30 Qs

CPCT Review #5

CPCT Review #5

11th - 12th Grade

30 Qs

Pilot Instruments Exam Review

Pilot Instruments Exam Review

9th - 12th Grade

33 Qs

Health Science Safety Quiz

Health Science Safety Quiz

9th - 12th Grade

36 Qs

Commissioning plumbing systems

Commissioning plumbing systems

Assessment

Quiz

Other

11th Grade

Medium

Created by

Lee Stearne

Used 6+ times

FREE Resource

34 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What must a plumber ensure about the pipework system once it has been installed into a property?

It must be visually appealing.

It must be sound, meaning it has no leaks.

It must be color-coded.

It must be externally polished.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is one of the steps a plumber should take after installing pipework in a property?

It should be painted.

It should be disinfected, meaning chemically cleaned.

It should be covered with insulation.

It should be tested for electrical conductivity.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does it mean to commission the pipework in plumbing?

To dismantle and reassemble.

To decorate it with accessories.

To set it up correctly.

To perform a strength test.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

After installation, what internal maintenance process should be performed on the pipework?

It should be flushed through (cleaned internally).

It should be lubricated.

It should be heated to a high temperature.

It should be scanned with a laser.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step in the testing process for plumbing pipework?

Soundness test

Visual inspection

Flushing out

Hand over to customer

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT a part of the plumbing testing process?

Disinfecting

Hand over to customer

Installation

Flushing out

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step to perform before conducting soundness testing in plumbing systems?

Check the water pressure

Walk around the system to ensure all joints have been made

Start the soundness test immediately

Clean the area around the pipes

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?