Search Header Logo

6035 Cold water Quiz 1

Authored by Ben Ashford

Other

Professional Development

Used 80+ times

6035 Cold water Quiz 1
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

45 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When installing a new indirect cold water system, which of the following should happen, according to the Water Regulations?

One tap (normally kitchen sink) drawn directly from the supply pipe

One tap (normally kitchen sink) should have a dedicated distribution pipe from the storage cistern

Mixer taps will require double check valves

Mixer taps should never be installed due to the pressure differences

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

According to British Standards and the Water Regulations, a drain off valve should be installed:

At every draw off point

At every high point in the system

At every low point in the system

Above the cold water storage cistern

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Pin holing in copper pipework is commonly caused by:

Hard water

Acidic water

Alkaline water

Pure water

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

While installing pipework in a property, you are called off site to another job. What would be the correct course of action with any open-ended pipework?

Place a warning label on every open end

Cap off with a push fit fitting

Warn the customer not to interfere with any pipework

Be as quick as you can to return

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

One of the major problems when leaving a dead leg in a cold water pipe is:

Electrolytic corrosion

Pitting of pipework

Reduction in water flow

Possible bacterial growth

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of using WRAS approved fittings in cold water pipework installations?

To meet legal requirements

To ensure durability

To avoid contamination

All of the above

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

After verifying that a new cold water installation is sound, what is the next step?

Prepare the benchmark certificate

Hand over to the customer

Flush the pipework and then hand over to the customer

Conduct a visual inspection with the customer

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?