1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What do the letters CDM stand for?

Control of Demolition and Management Regulations

Control of Dangerous Materials Regulations

Construction (Demolition Management) Regulations

Construction (Design and Management) Regulations

Answer explanation

The letters CDM stand for Construction (Design and Management) Regulations, making the correct choice Construction (Design and Management) Regulations.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Identify one method of enforcing regulations that are available to the Health and Safety Executive:

Health Notice

Improvement Notice

Obstruction Notice

Increasing insurance premiums

Answer explanation

The correct method of enforcing regulations available to the Health and Safety Executive is through an Improvement Notice.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What happens if a Prohibition Notice is issued by an Inspector of the local authority or the HSE?

The work in hand can be completed, but no new work started

The work can continue if adequate safety precautions are put in place

The work that is subject to the notice must cease

The work can continue, provided a risk assessment is carried out

Answer explanation

The work that is subject to the notice must cease

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A Health and Safety Executive Inspector can?

Only visit if they have made an appointment

Visit at any time

Only visit if accompanied by the principal contractor

Only visit to interview the site manager

Answer explanation

A Health and Safety Executive Inspector can visit at any time, as they have the authority to conduct unannounced inspections for safety compliance.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A Prohibition Notice means:

When you finish the work you must not start again

The work must stop immediately

Work is to stop for that day only

Work may continue until the end of the day

Answer explanation

A Prohibition Notice means that the work must stop immediately, as stated in the correct answer choice.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In what circumstances can an HSE Improvement Notice be issued?

If there is a breach of legal requirements

By warrant through the police

Only between Monday and Friday on site

Through the prosecution office

Answer explanation

An HSE Improvement Notice can be issued if there is a breach of legal requirements, making this the correct choice.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is an "Improvement Notice"?

A notice issued by the site principal contractor to tidy up the site

A notice from the client to the principal contractor to speed up the work

A notice issued by a Building Control Officer to deepen foundations

A notice issued by an HSE/local authority Inspector to enforce compliance with health and safety legislation

Answer explanation

A notice issued by an HSE/local authority Inspector to enforce compliance with health and safety legislation

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?