9.1 SMED Quiz

9.1 SMED Quiz

12th Grade

11 Qs

quiz-placeholder

Similar activities

Baking Mise en Place

Baking Mise en Place

9th - 12th Grade

10 Qs

Focus Improvement

Focus Improvement

9th - 12th Grade

10 Qs

SMED Lean Manufacturing Quiz

SMED Lean Manufacturing Quiz

12th Grade

6 Qs

Boiler 3-1 Feedwater Accessories

Boiler 3-1 Feedwater Accessories

11th - 12th Grade

12 Qs

HVACR Career Planning Quiz

HVACR Career Planning Quiz

12th Grade

13 Qs

SMED Lean Manufacturing Quiz

SMED Lean Manufacturing Quiz

12th Grade

16 Qs

Quiz on Single Minute Exchange of Die (SMED)

Quiz on Single Minute Exchange of Die (SMED)

12th Grade

8 Qs

GEMBA Quick Changeover and SMED Quiz

GEMBA Quick Changeover and SMED Quiz

12th Grade

6 Qs

9.1 SMED Quiz

9.1 SMED Quiz

Assessment

Quiz

Specialty

12th Grade

Hard

Created by

Nurhana Juraimi

FREE Resource

11 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does SMED stand for?

Single-Minute Exchange of Die

Single-Minute Equipment Deployment

Speedy Manufacturing Efficiency Design

Sequential Machine Efficiency Development

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main goal of SMED?

Increase setup times

Decrease manufacturing uptime

Improve teamwork

Reduce time for setup operations

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the definition of CHANGEOVER TIME in SMED?

Elapsed time between finishing the last part of the previous batch and finishing the first one of the next batch at full production speed

Time between finishing the first part of the previous batch and starting the next batch

Time taken to clean the equipment after setup

Time required to modify the equipment for quicker stops

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What are INTERNAL TASKS in SMED related to?

Tasks that are performed after the setup is complete

Tasks that involve external equipment

Tasks that can be performed while the process is running

Tasks that must be performed when the process is stopped

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What are EXTERNAL TASKS in SMED related to?

Tasks that are performed after the setup is complete

Tasks that can be performed while the process is running

Tasks that involve internal adjustments

Tasks that must be performed when the process is stopped

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of using SMED in manufacturing?

To increase setup times

To decrease manufacturing uptime

To improve efficiency by reducing setup time

To slow down production processes

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the significance of reducing changeover time in SMED?

It helps in increasing downtime

It improves overall equipment effectiveness

It has no impact on production efficiency

It only affects setup operations

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?