Quiz on Single Minute Exchange of Dies

Quiz on Single Minute Exchange of Dies

12th Grade

6 Qs

quiz-placeholder

Similar activities

Heat Exchangers Quiz

Heat Exchangers Quiz

12th Grade

10 Qs

Automotive measurement

Automotive measurement

8th Grade - University

10 Qs

Course 1 Chapter 5 Quiz

Course 1 Chapter 5 Quiz

9th - 12th Grade

8 Qs

Food Illnesses & Kitchen Safety

Food Illnesses & Kitchen Safety

9th - 12th Grade

11 Qs

SMED

SMED

1st - 12th Grade

12 Qs

Validity & Reliability

Validity & Reliability

10th - 12th Grade

10 Qs

RCPS

RCPS

1st - 12th Grade

10 Qs

3L3 Histology Connective

3L3 Histology Connective

10th - 12th Grade

12 Qs

Quiz on Single Minute Exchange of Dies

Quiz on Single Minute Exchange of Dies

Assessment

Interactive Video

Specialty

12th Grade

Hard

Created by

Nurhana Juraimi

FREE Resource

6 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main goal of Single Minute Exchange of Dies (SMED)?

To increase setup time

To slow down production

To reduce changeover time

To maximize inventory

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What are the two key points associated with SMED?

Product inspection and quality control

Inventory management and waste reduction

Internal setup and external setup

Machine operation and resource utilization

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the difference between internal setup and external setup?

External setup requires more resources than internal setup

Internal setup is faster than external setup

Internal setup is only applicable in manufacturing, external setup is for healthcare

Internal setup is done when the machine is off, external setup is done while the machine is running

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main focus when analyzing the process for SMED?

To understand the difference between internal and external setup

To increase the number of changeovers

To eliminate the need for setup operations

To reduce the time wasted during changeovers

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step in the SMED process?

Separating internal and external setup time

Documenting the current operations

Streamlining the setup operations

Converting internal setups to external setups

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is it important to convert internal setup times to external setup times?

To slow down production

To complicate the setup process

To increase the setup time

To reduce the overall changeover time