1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Bugs reported by the customer that have slipped by all software quality processes are represented in this metric.
a) Technical debt
b) Escaped defects
c) Risk burndown
d) Code quality
Answer explanation
Bugs reported by the customer that have slipped by all software quality processes are represented by escaped defects, making it the correct choice.
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Testing that often occurs between “Done” and “Done, Done” is:
a) Exploratory testing
b) Acceptance testing
c) Unit testing
d) Test driven development
Answer explanation
Testing that often occurs between 'Done' and 'Done, Done' is exploratory testing, where testers explore the application without predefined test cases.
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following is NOT one of the 12 core practices of XP:
a) The Planning Game & Simple Design and Pair Programming, On-site Customer
b) Planning Poker & Vertical Slicing and Minimize Waste , Visualize the flow
c) Small Releases & Continuous Testing and Collective Code Ownership, Coding Standards
d) System Metaphor & Refactoring and 40-Hour Work Week
Answer explanation
Choice b includes Planning Poker & Vertical Slicing and Minimize Waste, which are not part of the 12 core practices of XP.
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following is NOT a reason to use a Feature Breakdown Structure (FBS) instead of a Work Breakdown Structure (WBS)?
a) It allows communication between the customer and the development team in terms both can understand.
b) It allows you to baseline your project plan due to absence of change.
c) It allows tracking of work against the actual business value produced.
d) It allows the customer to prioritize the team’s work based on business value.
Answer explanation
The correct choice is b) It allows you to baseline your project plan due to absence of change.
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following is NOT one of the 12 core practices of XP?....
a) Visualize the flow
b) On-site Customer
c) Coding Standards
d) System Metaphor
Answer explanation
The correct choice is a) Visualize the flow because it is NOT one of the 12 core practices of XP.
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Team members who are part-time on your project will see at least a 15% reduction in their productivity per hour. The type of resource model in Agile is called:
a) Collocated
b) Fractional assignments
c) Distributed resources
d) Over-allocated resources
Answer explanation
Team members who are part-time on the project will see a reduction in productivity, making the resource model in Agile known as Fractional assignments.
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Frequent verification and validation is key in Agile but each approach produces a very different result. Verification determines ________________ whereas validation determines _____________.
a) if the product is “done” | if the product is “done-done”
b) if I am I building the product right | if I am I building the right product
c) if I am I building the right product | if I am I building the product right
d) if the product has passed unit testing | if the product has passed acceptance testing
Answer explanation
Verification determines if I am building the product right, whereas validation determines if I am building the right product.
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?