PMP Quiz 13

Authored by Shamsil ARFEEN

Other

University

PMP Quiz 13
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

81 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Bugs reported by the customer that have slipped by all software quality processes are represented in this metric.

a) Technical debt

b) Escaped defects

c) Risk burndown

d) Code quality

Answer explanation

Bugs reported by the customer that have slipped by all software quality processes are represented by escaped defects, making it the correct choice.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Testing that often occurs between “Done” and “Done, Done” is:

a) Exploratory testing

b) Acceptance testing

c) Unit testing

d) Test driven development

Answer explanation

Testing that often occurs between 'Done' and 'Done, Done' is exploratory testing, where testers explore the application without predefined test cases.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT one of the 12 core practices of XP:

a) The Planning Game & Simple Design and Pair Programming, On-site Customer

b) Planning Poker & Vertical Slicing and Minimize Waste , Visualize the flow

c) Small Releases & Continuous Testing and Collective Code Ownership, Coding Standards

d) System Metaphor & Refactoring and 40-Hour Work Week

Answer explanation

Choice b includes Planning Poker & Vertical Slicing and Minimize Waste, which are not part of the 12 core practices of XP.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT a reason to use a Feature Breakdown Structure (FBS) instead of a Work Breakdown Structure (WBS)?

a) It allows communication between the customer and the development team in terms both can understand.

b) It allows you to baseline your project plan due to absence of change.

c) It allows tracking of work against the actual business value produced.

d) It allows the customer to prioritize the team’s work based on business value.

Answer explanation

The correct choice is b) It allows you to baseline your project plan due to absence of change.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT one of the 12 core practices of XP?....

a) Visualize the flow

b) On-site Customer

c) Coding Standards

d) System Metaphor

Answer explanation

The correct choice is a) Visualize the flow because it is NOT one of the 12 core practices of XP.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Team members who are part-time on your project will see at least a 15% reduction in their productivity per hour. The type of resource model in Agile is called:

a) Collocated

b) Fractional assignments

c) Distributed resources

d) Over-allocated resources

Answer explanation

Team members who are part-time on the project will see a reduction in productivity, making the resource model in Agile known as Fractional assignments.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Frequent verification and validation is key in Agile but each approach produces a very different result. Verification determines ________________ whereas validation determines _____________.

a) if the product is “done” | if the product is “done-done”

b) if I am I building the product right | if I am I building the right product

c) if I am I building the right product | if I am I building the product right

d) if the product has passed unit testing | if the product has passed acceptance testing

Answer explanation

Verification determines if I am building the product right, whereas validation determines if I am building the right product.

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?