Building Technology Quiz CHAPTER 3 & 4

Building Technology Quiz CHAPTER 3 & 4

University

50 Qs

quiz-placeholder

Similar activities

GBD MODEL

GBD MODEL

University

50 Qs

第五課到第九課考試

第五課到第九課考試

8th Grade - University

50 Qs

pwss

pwss

University

46 Qs

EN 8591 Municipal Solid Waste Management

EN 8591 Municipal Solid Waste Management

University

45 Qs

Quiz

Quiz

University

50 Qs

Part 4: Người phụ nữ cầm khay

Part 4: Người phụ nữ cầm khay

University

55 Qs

Ground water engineering

Ground water engineering

University

50 Qs

TCSCLOTVET

TCSCLOTVET

University

50 Qs

Building Technology Quiz CHAPTER 3 & 4

Building Technology Quiz CHAPTER 3 & 4

Assessment

Quiz

Education

University

Hard

Created by

iza wahab

Used 1+ times

FREE Resource

50 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of site investigation in construction projects?

To monitor the quality of materials used

To conduct regular safety inspections

To gather information about the site's conditions

To determine the load-bearing capacity of the soil

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the role of a site supervisor in site investigation and preparation?

To conduct soil testing in a laboratory

To generate reports on site conditions

To install drainage systems

To engage geotechnical experts

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of geotechnical investigation in construction?

To classify different types of soil

To assess the quality of materials used

To determine the maximum load the soil can support

To conduct particle size distribution tests

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the significance of soil testing in site preparation?

To understand the soil and rock characteristics at the construction site

To assess the need for ground improvement techniques

To determine the rate and magnitude of settlement in soils

To classify soil into rocks, cohesive soils, and non-cohesive soils

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of waterproofing in construction?

To assess the quality of materials used

To make an object or structure waterproof or water-resistant

To determine the maximum load the soil can support

To classify different types of soil

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the role of drainage boards in construction?

To conduct particle size distribution tests

To create a slope that directs surface water away from the construction site

To apply a waterproofing coating to the exterior surface of the foundation walls

To help give water an easy path down to a footing drain

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the impact of surface water and groundwater on construction?

To prevent water from pooling or accumulating on the construction site

To interfere with the pouring and curing of concrete for foundations

To promote proper drainage and minimize erosion

To assess the quality of materials used

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?