MATHEMATIC QUIZ

Passage
•
Mathematics
•
7th Grade
•
Medium
+3
Standards-aligned
Diya Sruthin
Used 2+ times
FREE Resource
10 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A train travels at a constant speed of 80 kilometers per hour. It departs from City A at 9:00 AM and arrives at City B at 1:00 PM. How far is City B from City A?
320 kilometers
340 kilometers
230 kilometers
403 kilometers
Answer explanation
Solution: Time = 1:00 PM - 9:00 AM = 4 hours. Distance = Speed × Time = 80 km/h × 4 h = 320 km.
Tags
CCSS.3.MD.A.1
2.
MULTIPLE CHOICE QUESTION
45 sec • 2 pts
A car travels 120 kilometers in 2 hours and then another 150 kilometers in 3 hours. What is the average speed of the car for the entire journey?
54 kilometers per hour.
56 kilometers per hour.
64 kilometers per hour.
45 kilometers per hour.
Answer explanation
Solution: Total distance = 120 km + 150 km = 270 km. Total time = 2 h + 3 h = 5 h. Average speed = Total distance / Total time = 270 km / 5 h = 54 km/h.
Tags
CCSS.6.RP.A.3B
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Tom has a budget of $100 for buying books. If each book costs $8.75, how many books can he buy, and how much money will he have left?
51 books, $ 3.76 left.
15 books, $3.75 left.
11 books, $3.75 left.
41 books, $3.65 left.
Answer explanation
Solution: Number of books = $100 / $8.75 ≈ 11 books. Money left = $100 - (11 × $8.75) = $100 - $96.25 = $3.75.
Tags
CCSS.6.NS.B.3
4.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Lisa wants to buy a new bicycle that costs $300. She saves $15 every week. How many weeks will it take her to save enough money to buy the bicycle?
It will take Lisa 20 weeks to save enough money to buy the bicycle.
It will take Lisa 21 weeks to save enough money to buy the bicycle.
It will take Lisa 30 weeks to save enough money to buy the bicycle.
It will take Lisa 40 weeks to save enough money to buy the bicycle.
Answer explanation
Total Cost = $300
Savings per Week = $15
Number of Weeks = $300 / $15 = 20 weeks
Tags
CCSS.6.EE.B.7
5.
MULTIPLE CHOICE QUESTION
1 min • 2 pts
A recipe for a cake requires 4 cups of flour, 2 cups of sugar, and 1 cup of butter. If you want to make a cake using 10 cups of flour, how many cups of sugar and butter will you need?
You will need 4 cups of sugar and 5.6 cups of butter.
You will need 5 cups of sugar and 2.5 cups of butter.
You will need 8 cups of sugar and 4.6 cups of butter.
You will need 9 cups of sugar and 2.4 cups of butter.
Answer explanation
Step 1:
Find the scaling factor for the recipe.
The original amount of flour = 4 cups
The new amount of flour = 10 cups
Scaling factor = 10 cups / 4 cups = 2.5
Step 2:
Use the scaling factor to find the new amounts of sugar and butter.
New amount of sugar = Original amount of sugar × Scaling factor
New amount of sugar = 2 cups × 2.5 = 5 cups
New amount of butter = Original amount of butter × Scaling factor
New amount of butter = 1 cup × 2.5 = 2.5 cups
Tags
CCSS.5.MD.A.1
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A rectangular park is 60 meters long and 40 meters wide. There is a path of width 2 meters running around the inside of the park. What is the area of the path?
The area of the path is 354 square meters.
The area of the path is 374 square meters.
The area of the path is 378 square meters.
The area of the path is 384 square meters.
Answer explanation
Step 1:
Calculate the total area of the park.
Length of the park = 60 meters
Width of the park = 40 meters
Total area = Length × Width = 60 m × 40 m = 2400 m²
Step 2:
Calculate the dimensions of the inner rectangle (excluding the path).
Width of the path = 2 meters
Length of the inner rectangle = 60 meters - 2 × 2 meters = 56 meters
Width of the inner rectangle = 40 meters - 2 × 2 meters = 36 meters
Area of the inner rectangle = Length × Width = 56 m × 36 m = 2016 m²
Step 3:
Calculate the area of the path.
Area of the path = Total area - Inner area = 2400 m² - 2016 m² = 384 m²
7.
MULTIPLE CHOICE QUESTION
5 mins • 5 pts
1. Determine how many units of each product the company should produce to maximize its profit while meeting the customer demand and production time constraints.
2. Calculate the maximum profit the company can achieve.
The company should produce 7.5 units of Product A and 3 units of Product B to maximize its profit while meeting the production and demand constraints. The maximum profit the company can achieve is $585.
The company should produce 4.6 units of Product A and 3 units of Product B to maximize its profit while meeting the production and demand constraints. The maximum profit the company can achieve is $249
The company should produce 46 units of Product A and 3 units of Product B to maximize its profit while meeting the production and demand constraints. The maximum profit the company can achieve is $595.
The company should produce 8.4 units of Product A and 3 units of Product B to maximize its profit while meeting the production and demand constraints. The maximum profit the company can achieve is $545.
Answer explanation
Step 1:
Define the Variables
Let 𝑥x be the number of units of Product A produced each day. Let 𝑦y be the number of units of Product B produced each day.
Step 2:
Formulate the Constraints
Production time constraint: 2𝑥+3𝑦≤242x+3y≤24 (since the total production time cannot exceed 24 hours).
Minimum production constraints:
𝑥≥4x≥4 (at least 4 units of Product A)
𝑦≥3y≥3 (at least 3 units of Product B)
Step 3:
Formulate the Objective Function
The objective is to maximize the profit: Profit=50𝑥+70𝑦Profit=50x+70y
Step 4:
Solve the System of Inequalities
We need to determine the feasible region for the inequalities and find the values of 𝑥x and 𝑦y that maximize the profit within this region.
Inequality 11: 2𝑥+3𝑦≤242x+3y≤24
Inequality 22: 𝑥≥4x≥4
Inequality 33: 𝑦≥3y≥3
First, let's solve for 𝑦y in terms of 𝑥x from the production time constraint: 2𝑥+3𝑦≤242x+3y≤24 3𝑦≤24−2𝑥3y≤24−2x 𝑦≤24−2𝑥3y≤324−2x
Next, we need to find the intersection points of these constraints on the graph.
Step 5:
Find Intersection Points
For 𝑥=4x=4: 𝑦≤24−2(4)3y≤324−2(4) 𝑦≤24−83y≤324−8 𝑦≤163y≤316 𝑦≤5.33y≤5.33
For 𝑦=3y=3: 2𝑥+3(3)≤242x+3(3)≤24 2𝑥+9≤242x+9≤24 2𝑥≤152x≤15 𝑥≤7.5x≤7.5
So, the feasible region is bounded by:
𝑥≥4x≥4
𝑦≥3y≥3
2𝑥+3𝑦≤242x+3y≤24
Step 6:
Calculate the Profit at the Corner Points of the Feasible Region
The corner points are where the constraints intersect:
Point 𝐴(4,3)A(4,3)
Point 𝐵(7.5,3)B(7.5,3)
Point 𝐶(4,5.33)C(4,5.33)
Profit at Point 𝐴(4,3)A(4,3): Profit=50(4)+70(3)=200+210=410Profit=50(4)+70(3)=200+210=410
Profit at Point 𝐵(7.5,3)B(7.5,3): Profit=50(7.5)+70(3)=375+210=585Profit=50(7.5)+70(3)=375+210=585
Profit at Point 𝐶(4,5.33)C(4,5.33): Profit=50(4)+70(5.33)=200+373.1=573.1Profit=50(4)+70(5.33)=200+373.1=573.1
Step 7:
Determine the Maximum Profit
The maximum profit occurs at Point 𝐵(7.5,3)B(7.5,3).
Number of units of Product A to produce: 𝑥=7.5x=7.5
Number of units of Product B to produce: 𝑦=3y=3
Maximum Profit: $585
Create a free account and access millions of resources
Similar Resources on Wayground
10 questions
Decimal Multiplication: Area Models & Multi-Step Challenges

Quiz
•
5th Grade - University
10 questions
Measurement Unit Challenge: Solve Conversion Word Problems

Quiz
•
5th Grade - University
10 questions
Fraction and Decimal Fun: Mixed Numbers Challenge

Quiz
•
5th Grade - University
10 questions
Mastering Decimal Multiplication & Word Problems

Quiz
•
6th Grade - University
10 questions
DMS Ratios & Proportions

Quiz
•
6th - 9th Grade
12 questions
Proportion Story Problems

Quiz
•
7th Grade
10 questions
Converting Units Metric and Customary

Quiz
•
5th Grade - University
10 questions
Measurement Mix-Up: Comparing Lengths and Volumes

Quiz
•
4th Grade - University
Popular Resources on Wayground
18 questions
Writing Launch Day 1

Lesson
•
3rd Grade
11 questions
Hallway & Bathroom Expectations

Quiz
•
6th - 8th Grade
11 questions
Standard Response Protocol

Quiz
•
6th - 8th Grade
40 questions
Algebra Review Topics

Quiz
•
9th - 12th Grade
4 questions
Exit Ticket 7/29

Quiz
•
8th Grade
10 questions
Lab Safety Procedures and Guidelines

Interactive video
•
6th - 10th Grade
19 questions
Handbook Overview

Lesson
•
9th - 12th Grade
20 questions
Subject-Verb Agreement

Quiz
•
9th Grade
Discover more resources for Mathematics
20 questions
One Step Equations All Operations

Quiz
•
6th - 7th Grade
5 questions
Absolute Value/Additive Inverse CYU

Quiz
•
7th Grade
34 questions
Math Review

Quiz
•
6th - 8th Grade
10 questions
Adding Rational Numbers

Quiz
•
7th Grade
20 questions
Absolute value

Quiz
•
7th Grade
8 questions
Number Sense Quiz Prep

Quiz
•
7th Grade
21 questions
Adding and Subtracting Integers

Quiz
•
7th Grade