1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following should be carried out before any electrical work takes place?

Safe Isolation

Safe Insulation

Safe Continuity

Safe Polarity

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

      Which one of the following units should be used when checking if a circuit is dead?

Multi-meter

Proving Unit

RCD

OHMs

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

       Which one of the following tests should be carried out on insulation?

Polarity

Resistance

Impedance

Continuity

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

        Which one of the following tests should be carried out to ensure that phase and neutral are not cross connected?

Polarity

Resistance

Impedance

Continuity

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

      The RCD on a domestic circuit should have a milliamp (mA) rating of

30

40

50

60

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

       Which part of the Building Regulations relates to electrical safety?

Part B

Part P

Part E

Part M

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

      As well as a proving unit, which one of the following is also used to check if a circuit is dead?

Approved fuse tester

Approved manometer

Approved multi-meter

Approved voltage indicator

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?