Hand boss review

Hand boss review

Professional Development

91 Qs

quiz-placeholder

Similar activities

GendEd (Set 4) February

GendEd (Set 4) February

Professional Development

90 Qs

WAM 35

WAM 35

Professional Development

95 Qs

Properties of Gases in Plumbing and Domestic Heating

Properties of Gases in Plumbing and Domestic Heating

Professional Development

88 Qs

examen de ingles mining truck

examen de ingles mining truck

Professional Development

90 Qs

CEREBRAL AEROBICS 2022

CEREBRAL AEROBICS 2022

University - Professional Development

86 Qs

FF2 Ch 26

FF2 Ch 26

Professional Development

92 Qs

English test crane

English test crane

Professional Development

90 Qs

NURSING PRACTICE 4 📌 FINAL PROOF READ MAY NLE 2022

NURSING PRACTICE 4 📌 FINAL PROOF READ MAY NLE 2022

Professional Development

91 Qs

Hand boss review

Hand boss review

Assessment

Quiz

Professional Development

Professional Development

Easy

Created by

Gary Boyle

Used 1+ times

FREE Resource

91 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The purpose of this code is to provide_______.

general knowledge for individuals interested in plumbing installations

minimum requirements and standards for the protection of health and safety

the general public with ideas for the installation of pipes and fixtures

understanding of devices and appurtenances that are installed by contractors

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The ability to have direct access without the necessity of removing any panel, door, or similar obstruction is________.

accessible by code

a good plumbing assembly

always a code violation

readily accessible

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A half bathroom is generally known as_________.

a room equipped with a shower or a bathtub

a room equipped with a water closet and a bidet

a room equipped with a water closet and a whirlpool bathtub

a room equipped with only a water closet and lavatory

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The device which receives the discharge of drainage and is designed to retain organic matter and permits the liquid to seep through the sides and bottom is known as_________.

a cesspool

a septic leach field

a septic tank

dry well

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The horizontal piping of drainage system which extends from the end of the building drain and which receives the discharge of the building drain and conveys it to the public or private sewer is a __________.

building branch drain

building drain

building lateral

building sewer

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Any plumbing fixture, tank, receptacle, equipment or device arranged in such a manner through which it may be possible for non-potable, unclean or polluted water to enter a potable water system is a_________.

back-flow

back-pressure

back-siphonage

cross-connection

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Solders and fluxes with a lead content greater than ______

are prohibited in piping systems used to convey potable.

0.1 percent

0.2 percent

0.3 percent

0.4 percent

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?