ALE REVIEW

ALE REVIEW

University

50 Qs

quiz-placeholder

Similar activities

Fire Code 2

Fire Code 2

University

53 Qs

VDA - Fastener (Part 1/3)

VDA - Fastener (Part 1/3)

University

46 Qs

VDA - Door (Part 2/2)

VDA - Door (Part 2/2)

University

49 Qs

10_Penjas_19-11

10_Penjas_19-11

1st Grade - University

50 Qs

Materiale Ndërtimi Test 1

Materiale Ndërtimi Test 1

University

45 Qs

Architect's Guidelines 2016

Architect's Guidelines 2016

University

48 Qs

Building Laws Preboard 1 of 2

Building Laws Preboard 1 of 2

KG - Professional Development

50 Qs

Bldg. Tech 2 (CTTO)

Bldg. Tech 2 (CTTO)

University

50 Qs

ALE REVIEW

ALE REVIEW

Assessment

Quiz

Architecture

University

Practice Problem

Hard

Created by

Loyloy Lanticse

Used 10+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

50 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

  1. TEST I. SPP

  2. 1. who gives the directive to start the projects?

Project Manager

Owner

Construction Manager

Contractor

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

  1. 2. which the following is not a responsibility of the owner?

a. provide full information as to his requirement for the project

b. designate a representative authorized to act on his behalf

c. promptly examine and render decisions pertaining to documents submitted by the architect

d. issue order directly to the general contractor

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

  1. 3. which is not a dis advantage of architectural design competitions?

a. time consuming

b. expensive

c. many options for the clients

d. limited time for participants

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

  1. 4. What should the architect do if the owner makes changes orders?

a. check with the contractor

b. neglect the owner

c. follow the owner

d. evaluate

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

  1. 5. The architectural plans, technical specifications for utilities, and other details are already done. now, it is already time to secure for a building permit from the office of the building official. under the standards of professional practice of 2010, from which phase is the dream house project undergoing now?

a. design development phase

b. contract document phase

c. construction phase

d. post-construction phase

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

  1. 6. when project are still manageable in size, the architect was then assisted by the construction inspector. what is the traditional name/call for the Construction Inspector?

a. clerk of work

b. foreman

c. time keeper

d. construction clerk

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

  1. 8. GOCC means?

a. Government-Owned or Controlled Corporation

b. General Organization Consulting Council

c. Government Organization of Consulting Committee

d. Government Official on Controlled Corporations

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?