
GMJ 6035 electrical quiz. Again.
Authored by Glen Johnson
Other
Professional Development
Used 97+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
21 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What are the initial steps of the Safe Isolation procedure?
Test the operation of the Voltage Indicator and turn off the appliance.
Test the operation of the Voltage Indicator and Locate the source of the supply.
Locate the source of the supply then test the operation of the Voltage Indicator.
Turn off the appliance then test the operation of the Voltage Indicator.
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
When pulling out a 3 pin plug, which terminal should disconnect last?
Earth
Live
Neutral
3.
MULTIPLE SELECT QUESTION
45 sec • 1 pt
When should a Temporary Continuity Bond be fitted?
Before work on metallic pipework
Before cutting into a metallic pipe
Before removing a metallic component , such as a pump or gas meter, from a metallic pipe
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What test ensures Live and Neutral are connected up correctly?
Continuity test
Impedance test
Insulation Resistance test.
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which electrical test ensures there is no damage to the insulation protective sheathing on the installation cables?
Continuity test
Impedance test
Insulation Resistance test.
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What size cable would be used to install a Radial lighting circuit?
1.5mm twin and earth
2.5mm twin and earth
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A Ring Main circuit should be installed with what size cable?
1.5mm twin and earth
2.5mm twin and earth
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?