6 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Describe the main role of the architect.

They manage the construction site.

They design the internal services within the building.

They convert the clients’ ideas and requirements into a building design and working drawings.

They source all the materials needed to complete a project.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A variation order can be signed by which one of the following?

Clerk of works

Architect

Building control officer

Main contractor

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who out of the construction team will visit the site on occasions and on behalf of the local authority in order to confirm that the Building Regulations are being observed?

Architect

Building control officer (BCO)

Main contractor

Buyer

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If a sub-contractor has an installation problem that needs resolving, who would he ask for advice?

Architect

Clerk of works

Main contractor

Building control officer

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does the building services engineer do?

They manage the construction site.

They source all the materials needed to complete a project.

They design the internal services within the building, which will be cost effective, environmentally sensitive and with good maintenance access.

They convert the clients’ ideas and requirements into a building design and working drawings.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Describe the difference between the role of the buyer and the estimator.

The buyer sources materials and the estimator designs the building.

The buyer sources materials and the estimator breaks down the Bill of Quantities into unit parts.

The buyer manages the construction site and the estimator sources materials.

The buyer designs the building and the estimator manages the construction site.

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?