Search Header Logo

Guidelines for Marking Exams

Authored by Miles Tarplee

Professional Development

12th Grade

Used 1+ times

Guidelines for Marking Exams
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

30 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

State two environmental effects that can cause materials to degrade.

Rain, Ultraviolet

Freezing conditions, Heat

Mould growth, Insect attack

All of the above

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

State the two factors, along with Force, used to determine the mechanical power required to move a load.

Distance, Time

Speed, Acceleration

Mass, Velocity

Pressure, Volume

3.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

During the design stage, there are various methods used to display the overall finished look of a project. Which of the following are methods used to display the finished look of a project? (Select two)

3D model

2D sketch

3D CAD drawing

Blueprint

4.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

During an installation project at a new hotel, a refrigeration engineer is given a layout drawing to work from. Which of the following pieces of information can be determined from a layout drawing for a new installation? (Select two)

Locations of specific items

Budget for the project

Dimensions/area/length/measurements

Project timeline

5.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

State the SI unit of measurement for each of the following: a) Energy b) Temperature

Joules

Newtons

Celsius

Kelvin

Watts

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A circuit is to be extended that was wired using the older red and black live conductors. State the current cable core colour that is matched to an existing black coloured conductor.

Blue

Brown

Green

Yellow

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Describe planned maintenance and reactive maintenance, giving an example of each.

Planned maintenance - identifying and stopping issues from becoming a problem; Example: Annual boiler service. Reactive maintenance - repair/replace once something has gone wrong; Example: Faulty component.

Planned maintenance - repair/replace once something has gone wrong; Example: Faulty component. Reactive maintenance - identifying and stopping issues from becoming a problem; Example: Annual boiler service.

Planned maintenance - identifying and stopping issues from becoming a problem; Example: Faulty component. Reactive maintenance - repair/replace once something has gone wrong; Example: Annual boiler service.

Planned maintenance - repair/replace once something has gone wrong; Example: Annual boiler service. Reactive maintenance - identifying and stopping issues from becoming a problem; Example: Faulty component.

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?

Discover more resources for Professional Development