Setting out 102

Setting out 102

1st Grade

20 Qs

quiz-placeholder

Similar activities

Daily Quiz 19May2020_ Refresher of Vivo Services and Product

Daily Quiz 19May2020_ Refresher of Vivo Services and Product

KG - Professional Development

20 Qs

CorpU & LVC Adhi Karya

CorpU & LVC Adhi Karya

1st - 5th Grade

20 Qs

Glaze Eduction

Glaze Eduction

1st Grade - University

19 Qs

LEA 1 #4

LEA 1 #4

1st Grade

15 Qs

Quiz Pengolahan Penyimpanan dan Pengemasan Pangan

Quiz Pengolahan Penyimpanan dan Pengemasan Pangan

1st - 12th Grade

19 Qs

Pilotaż i przewodnictwo turystyczne

Pilotaż i przewodnictwo turystyczne

1st - 3rd Grade

15 Qs

QUIZ 1 : TOPIC 8 [PROCESS COSTING]

QUIZ 1 : TOPIC 8 [PROCESS COSTING]

1st Grade - University

20 Qs

Give kids a hand | Scratch Round1

Give kids a hand | Scratch Round1

1st - 7th Grade

20 Qs

Setting out 102

Setting out 102

Assessment

Quiz

Professional Development

1st Grade

Practice Problem

Medium

Created by

Michael Keenan

Used 2+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What drawing would be used to show the foundation detail?

Front elevation.

Location plan.

Site plan.

Section through.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which scale is commonly used on a detail drawing?

1:5

1:100

1:250

1:2500

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following could be used to take a measurement from an original drawing?

Protractor.

Scale rule.

T square.

Set square.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why must existing gas supplies be located before building work begins?

To cover them with concrete for protection.

To ensure new pipework can be connected.

To allow maintenance to be carried out.

To prevent damage to the services.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why should site clearance take place?

To allow materials to be delivered.

To ensure the site is ready for setting out.

To reduce the cost of removing the topsoil.

To allow Building Inspectors time to inspect the site.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following describes the building line?

A line from which setting out will be taken, approved by the HSE.

The centre line of a proposed or existing building.

A gridline used to mark the position of internal walls.

A line from which setting out will be taken, approved by the Local Authority.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What ratio should be used when setting out a right angled corner?

1:2:3

3:4:5

4:5:6

5:6:7

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?