Setting out 102

Setting out 102

1st Grade

20 Qs

quiz-placeholder

Similar activities

Quizz Design

Quizz Design

1st Grade

18 Qs

Traffic Signs

Traffic Signs

KG - 11th Grade

18 Qs

Tech Development 2 (TFA)

Tech Development 2 (TFA)

1st - 10th Grade

20 Qs

GSOC Social Impact Team Happy Hour - May

GSOC Social Impact Team Happy Hour - May

1st - 5th Grade

18 Qs

Acronyms versus abbreviations

Acronyms versus abbreviations

1st Grade

15 Qs

Philips Trivia

Philips Trivia

1st - 3rd Grade

20 Qs

SHASSIC 2018

SHASSIC 2018

1st - 12th Grade

15 Qs

Jupiter System Architecture

Jupiter System Architecture

1st Grade

15 Qs

Setting out 102

Setting out 102

Assessment

Quiz

Professional Development

1st Grade

Medium

Created by

Michael Keenan

Used 2+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What drawing would be used to show the foundation detail?

Front elevation.

Location plan.

Site plan.

Section through.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which scale is commonly used on a detail drawing?

1:5

1:100

1:250

1:2500

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following could be used to take a measurement from an original drawing?

Protractor.

Scale rule.

T square.

Set square.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why must existing gas supplies be located before building work begins?

To cover them with concrete for protection.

To ensure new pipework can be connected.

To allow maintenance to be carried out.

To prevent damage to the services.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why should site clearance take place?

To allow materials to be delivered.

To ensure the site is ready for setting out.

To reduce the cost of removing the topsoil.

To allow Building Inspectors time to inspect the site.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following describes the building line?

A line from which setting out will be taken, approved by the HSE.

The centre line of a proposed or existing building.

A gridline used to mark the position of internal walls.

A line from which setting out will be taken, approved by the Local Authority.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What ratio should be used when setting out a right angled corner?

1:2:3

3:4:5

4:5:6

5:6:7

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?