CECMAT - Concrete Part 3

Authored by Joshua Santos

Other

University

Used 3+ times

CECMAT - Concrete Part 3
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

11 questions

Show all answers

1.

FILL IN THE BLANK QUESTION

1 min • 1 pt

the only slump that can be measured in the test. The measurement is taken between the top of the cone and the top of the concrete after the cone has been removed

2.

FILL IN THE BLANK QUESTION

1 min • 1 pt

the indication of very low water-cement ratio, which results in dry mixes. These type of concrete is generally used for road construction

3.

FILL IN THE BLANK QUESTION

1 min • 1 pt

This is an indication that the water-cement ratio is too high, i.e. concrete mix is too wet or it is a high workability mix, for which a slump test is not appropriate

4.

FILL IN THE BLANK QUESTION

1 min • 1 pt

indicates that the result is incomplete, and concrete to be retested.

5.

FILL IN THE BLANK QUESTION

2 mins • 1 pt

CONSISTENCY (SLUMP) Maximum and Minimum: Reinforced foundation walls and footings

6.

FILL IN THE BLANK QUESTION

2 mins • 1 pt

CONSISTENCY (SLUMP) Maximum and Minimum: Plain footings, caissons, and substructure walls

7.

FILL IN THE BLANK QUESTION

2 mins • 1 pt

CONSISTENCY (SLUMP) Maximum and Minimum: Slabs, beams, thin reinforced walls & building columns

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?