
6035 Drainage Outcome 4 part 4
Authored by Brendan Cocks
others
Professional Development
Used 11+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
49 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What should you inspect before starting work on rainwater systems to ensure the gutter does not look wavy?
The underfelt of the roof
The facia boards
The paint on the facia boards
The gutter itself
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Why is it important to inspect the underfelt of the roof before installing a rainwater system?
To ensure the roof is clean
To prevent the facia board from rotting
To make sure the gutter is straight
To check for proper paint application
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What should be done to the facia board if necessary before installation?
Replace it
Paint it
Clean it
Remove it
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following tools is required for the installation of rainwater systems?
Paintbrush
Power drill
Wrench
Pliers
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which type of screwdriver is listed as a required tool for installing rainwater systems?
Flathead screwdriver
Pozidrive screwdriver
Phillips screwdriver
Torx screwdriver
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What tool is used for cutting during the installation of rainwater systems?
Claw hammer
Bradawl
Hacksaw
File
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which tool is used to create pilot holes in the installation of rainwater systems?
Bradawl
String line
File
Claw hammer
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?