25 questions

Show all answers

1.

OPEN ENDED QUESTION

3 mins • 1 pt

What are three possible causes of electrical fire in an electrical installation?

Evaluate responses using AI:

OFF

Answer explanation

Poor cable terminations

Overloaded circuits and equipment

Faulty or malfunctioning equipment

Insulation breakdown

Flashover

Corrosion

2.

OPEN ENDED QUESTION

3 mins • 1 pt

What types of materials on the construction site could be a potential fire hazard? Name three types

Evaluate responses using AI:

OFF

Answer explanation

Wood, paper, textiles, plastics, polystyrene, flammable liquids, live electrical equipment

3.

OPEN ENDED QUESTION

3 mins • 1 pt

Name two types of fire extinguishers that you could use to extinguish an electrical fire?

Evaluate responses using AI:

OFF

Answer explanation

Dry powder

Carbon dioxide

Vaporizing foam

4.

OPEN ENDED QUESTION

3 mins • 1 pt

While you are working on the building site you discover a fire in a rubbish skip which is situated inside the building. What is the 1st thing that you must do?

Evaluate responses using AI:

OFF

Answer explanation

Raise the alarm

5.

OPEN ENDED QUESTION

3 mins • 1 pt

The materials in a skip are wood and general rubbish. What would be the most suitable type of extinguisher that you would use in this situation to put out the fire?

Evaluate responses using AI:

OFF

Answer explanation

Water extinguisher or fire hose. Or Class A

6.

OPEN ENDED QUESTION

3 mins • 1 pt

This fire requires 3 essential components to continue to burn. What are these components?

Evaluate responses using AI:

OFF

Answer explanation

Fuel

Heat

Oxygen

7.

OPEN ENDED QUESTION

3 mins • 1 pt

If a fire had occurred in an electrical switchboard on the building site what is the 1st thing that you must do?

Evaluate responses using AI:

OFF

Answer explanation

Isolate the supply

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?