M3 Construction Plans and Documents Trade Terms  (32)

M3 Construction Plans and Documents Trade Terms (32)

9th - 12th Grade

32 Qs

quiz-placeholder

Similar activities

Achieve BIM I Semester Exam (Word)

Achieve BIM I Semester Exam (Word)

9th Grade

34 Qs

TALLER METODOLOGIA DE LA INVESTIGACION

TALLER METODOLOGIA DE LA INVESTIGACION

11th Grade

30 Qs

EVAL SEPTIMO 2P

EVAL SEPTIMO 2P

10th Grade

30 Qs

Design and Technology Y11UK or 10th grade US general knowled

Design and Technology Y11UK or 10th grade US general knowled

10th Grade

31 Qs

Ôn tập 1 tiết

Ôn tập 1 tiết

9th Grade

30 Qs

EmTech Q1 Reviewer

EmTech Q1 Reviewer

11th Grade

35 Qs

Infection Control: Proper Disinfection 9/10

Infection Control: Proper Disinfection 9/10

9th - 12th Grade

28 Qs

M3 Construction Plans and Documents Trade Terms  (32)

M3 Construction Plans and Documents Trade Terms (32)

Assessment

Quiz

Instructional Technology

9th - 12th Grade

Practice Problem

Medium

Created by

John Bruchak

Used 10+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

32 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A legal right-of-way provision on another person’s property (for example, the right of a neighbor to build a road or a public utility to install water and gas lines on the property). A property owner cannot build on an area where an _______ has been identified.

Dimension Lines

Easement

Front Setback

Property Lines

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The distance from the property line to the front of the building.

Dimension Lines

Easement

Front Setback

Property Lines

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The recorded legal boundaries of a piece of property.

Dimension Lines

Easement

Front Setback

Property Lines

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Lines on a drawing with a measurement indicating length.

Dimension Lines

Easement

Front Setback

Property Lines

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A document used during the construction process that is used to clarify and resolve questions and information gaps in plans, drawings, specifications, and agreements.

Computer-Aided Drafting (CAD)

Finish Floor Elevation (FFE)

Not to Scale (NTS)

Request for Information (RFI)

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The making of a set of construction drawings with the aid of a computer.

Computer-Aided Drafting (CAD)

Finish Floor Elevation (FFE)

Not to Scale (NTS)

Request for Information (RFI)

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The uppermost surface of a floor once construction is complete and prior to any finishes or coverings being applied. It is used as a reference plane for other vertical dimensions.

Computer-Aided Drafting (CAD)

Finish Floor Elevation (FFE)

Not to Scale (NTS)

Request for Information (RFI)

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?