M5 Floor Systems Trade Terms 35

M5 Floor Systems Trade Terms 35

9th - 12th Grade

35 Qs

quiz-placeholder

Similar activities

Chapter 1 Types and components of Computer Systems

Chapter 1 Types and components of Computer Systems

9th - 12th Grade

30 Qs

Python

Python

9th - 12th Grade

30 Qs

Graphic Design Safety Test CTAE

Graphic Design Safety Test CTAE

6th - 12th Grade

30 Qs

Key Features of Exponential Functions

Key Features of Exponential Functions

9th - 12th Grade

33 Qs

Ôn tập 1 tiết

Ôn tập 1 tiết

9th Grade

30 Qs

Alhazen - Thunkable Assessment

Alhazen - Thunkable Assessment

10th Grade

39 Qs

EmTech Q1 Reviewer

EmTech Q1 Reviewer

11th Grade

35 Qs

Proofreader Marks

Proofreader Marks

9th Grade

35 Qs

M5 Floor Systems Trade Terms 35

M5 Floor Systems Trade Terms 35

Assessment

Quiz

Instructional Technology

9th - 12th Grade

Medium

Created by

John Bruchak

Used 5+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

35 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Written document included with a set of prints that clarifies information presented on the prints and provides additional information not easily presented on the prints.

Scab

Span

Specifications

Squash Block

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Short joists that run from an opening to a bearing.

Floor Joists

Rim Joist

Tail Joists

Trimmer Joists

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Consist of a vertical web with flanges bonded to the top and bottom. The webs are made of OSB or plywood and the flanges are grooved to fit over the web.

Floor Joists

I-Joists

Trimmer Joists

Trimmer Joists

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A series of parallel, horizontal framing members that make up the body of the floor frame.

Floor Joists

Rim Joist

Tail Joists

Trimmer Joists

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A framing member that surrounds the outer edge of the joist and stabilizes the floor system.

Floor Joists

Rim Joist

Tail Joists

Trimmer Joists

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Full-length joists that reinforce a rough opening in the floor.

Floor Joists

Rim Joist

Tail Joists

Trimmer Joists

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The first and last joists in a floor system; they run parallel to the floor joists.

End Joists

I-Joists

Tail Joists

Rim Joist

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others