EPA mock test 2

EPA mock test 2

Professional Development

50 Qs

quiz-placeholder

Similar activities

BU - MECH-HVAC FLASHCARD

BU - MECH-HVAC FLASHCARD

Professional Development

55 Qs

3rd Party Retention Final

3rd Party Retention Final

Professional Development

50 Qs

Water Distribution Ch 1-4

Water Distribution Ch 1-4

Professional Development

46 Qs

gastrointestinal system

gastrointestinal system

Professional Development

55 Qs

Brinton- Preliminary Assessment

Brinton- Preliminary Assessment

1st Grade - Professional Development

50 Qs

2018 International Plumbing Code

2018 International Plumbing Code

Professional Development

49 Qs

Samsung Appliance Quiz

Samsung Appliance Quiz

Professional Development

51 Qs

OTC 105

OTC 105

Professional Development

48 Qs

EPA mock test 2

EPA mock test 2

Assessment

Quiz

Other

Professional Development

Easy

Created by

Ben Ashford

Used 1+ times

FREE Resource

50 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

At what point would an employer be required to produce a written Health and Safety policy to be compliant with the Health and Safety at Work Act?

When trading as a sole trader.

When an accident has occurred on site.

When employing five or more people.

When becoming a Limited Company.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How would you minimise the likelihood of an accident occurring during a construction project?

Read the job specification provided before starting the works.

Refer to the risk assessment before starting the works.

Ask a colleague for advice on how to undertake the work safely.

Refer to the Health and Safety at Work Act before starting the works.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What actions should you take if you discover a fire on a building site?

Lock all emergency doors and secure the building.

Raise the alarm and vacate to the designated muster point.

Tackle the fire yourself.

Collect all your belongings and leave the building.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

For what reason must LPG Cylinders be stored in a cage, open to the outside air?

To keep them cold.

To enable any escaping gas to disperse into the air.

To enable easy access for anyone to change the bottles.

To allow the bottles to naturally weather.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What access equipment would you select to repair a leaking gutter joint on a house?

Tall step ladder.

Extension ladder.

Mobile tower scaffold.

Trestles and planks.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The proprietary support system would enable a worker to operate safely when working where?

In a loft space.

Under a wooden floor.

In an excavation.

On a floor.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What check would you undertake on a 110-volt power tool before commencing work with it?

It carries a current PAT test sticker that is within date.

It is yellow in colour.

It is made from conductive materials.

It has a fully charged battery.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?