Install sewerage pumpsets

Install sewerage pumpsets

Professional Development

16 Qs

quiz-placeholder

Similar activities

Accepting Change Quiz

Accepting Change Quiz

Professional Development

15 Qs

Differentiate between LO and LE

Differentiate between LO and LE

Professional Development

17 Qs

Vocabulary: Housekeeping

Vocabulary: Housekeeping

University - Professional Development

20 Qs

R-COMM Quiz

R-COMM Quiz

Professional Development

20 Qs

Moby-Dick 2

Moby-Dick 2

Professional Development

20 Qs

Passive Voice By T.Kenny

Passive Voice By T.Kenny

7th Grade - Professional Development

15 Qs

Working in Teams - Recap

Working in Teams - Recap

Professional Development

12 Qs

5S Concepts Quiz

5S Concepts Quiz

Professional Development

15 Qs

Install sewerage pumpsets

Install sewerage pumpsets

Assessment

Quiz

Professional Development

Professional Development

Practice Problem

Medium

Created by

jason withani

Used 5+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

16 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

When measuring the different properties of sewage, which of the options below does the term metres head refer to?

Consistency

Pressure

Flow rate

Size of somebody's bonce

2.

MULTIPLE CHOICE QUESTION

1 min • 2 pts

What is meant by design flow in relation to the properties of sewage and pump performance outcomes?

Velocity of wastewater flow from the pipe outlet above the pump

Getting into a state of deep concentration when calculating sewer pump sizes

Peak flow of wastewater into the collection well from all upstream fixtures and ground and rainwater ingress

Distance that wastewater flows from the pipe outlet above the pump

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which of the following tools or equipment items is not suitable for loading and shifting pump sets?

Hand trolley

Hoists and jacks

Gatic lifter (for manhole covers)

Forklift

4.

MULTIPLE CHOICE QUESTION

1 min • 2 pts

450 kPa =

45 M HEAD

4.5 M HEAD

450 M HEAD

HEADACHE

5.

MULTIPLE SELECT QUESTION

1 min • 2 pts

Select two WHS requirements that are specific to installing a sewerage pump set in a pump room located in an underground carpark.

Follow correct manual handling procedures

Working at heights

Media Image

Minimise exposure to any dust and fumes

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Select the appropriate piece of equipment for levelling and aligning sewerage pump sets.

Spirit level

Boning rods

String line

Space Lasers

7.

MULTIPLE CHOICE QUESTION

1 min • 2 pts

The minimum size of pump discharge pipes shall be at least ___ and not less than the pump outlet size.

DN 25

DN 32

DN 40

yay big

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?