Install sewerage pumpsets

Install sewerage pumpsets

Professional Development

16 Qs

quiz-placeholder

Similar activities

Drilling Engineering

Drilling Engineering

Professional Development

16 Qs

post test CRI kelas XI

post test CRI kelas XI

Professional Development

15 Qs

HYBN Operators Weekly Test

HYBN Operators Weekly Test

Professional Development

20 Qs

CTO 2 Pumps

CTO 2 Pumps

Professional Development

18 Qs

Vision & Ink System

Vision & Ink System

Professional Development

12 Qs

ACO 2020

ACO 2020

Professional Development

20 Qs

Cooling System

Cooling System

Professional Development

15 Qs

Hot and cold water 2

Hot and cold water 2

Professional Development

11 Qs

Install sewerage pumpsets

Install sewerage pumpsets

Assessment

Quiz

Professional Development

Professional Development

Medium

Created by

jason withani

Used 3+ times

FREE Resource

16 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

When measuring the different properties of sewage, which of the options below does the term metres head refer to?

Consistency

Pressure

Flow rate

Size of somebody's bonce

2.

MULTIPLE CHOICE QUESTION

1 min • 2 pts

What is meant by design flow in relation to the properties of sewage and pump performance outcomes?

Velocity of wastewater flow from the pipe outlet above the pump

Getting into a state of deep concentration when calculating sewer pump sizes

Peak flow of wastewater into the collection well from all upstream fixtures and ground and rainwater ingress

Distance that wastewater flows from the pipe outlet above the pump

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which of the following tools or equipment items is not suitable for loading and shifting pump sets?

Hand trolley

Hoists and jacks

Gatic lifter (for manhole covers)

Forklift

4.

MULTIPLE CHOICE QUESTION

1 min • 2 pts

450 kPa =

45 M HEAD

4.5 M HEAD

450 M HEAD

HEADACHE

5.

MULTIPLE SELECT QUESTION

1 min • 2 pts

Select two WHS requirements that are specific to installing a sewerage pump set in a pump room located in an underground carpark.

Follow correct manual handling procedures

Working at heights

Media Image

Minimise exposure to any dust and fumes

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Select the appropriate piece of equipment for levelling and aligning sewerage pump sets.

Spirit level

Boning rods

String line

Space Lasers

7.

MULTIPLE CHOICE QUESTION

1 min • 2 pts

The minimum size of pump discharge pipes shall be at least ___ and not less than the pump outlet size.

DN 25

DN 32

DN 40

yay big

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?