T25CT building and footing setout

T25CT building and footing setout

University

15 Qs

quiz-placeholder

Similar activities

Quality costs

Quality costs

University

10 Qs

ENGLISH GRAMMAR

ENGLISH GRAMMAR

5th Grade - Professional Development

15 Qs

DAKSHIN DHAMAKA

DAKSHIN DHAMAKA

University

15 Qs

HR club quiz

HR club quiz

University

15 Qs

Would you rather?

Would you rather?

University

12 Qs

Job Titles

Job Titles

University

20 Qs

Vocabulary: Housekeeping

Vocabulary: Housekeeping

University - Professional Development

20 Qs

Vitas & Itas

Vitas & Itas

University

10 Qs

T25CT building and footing setout

T25CT building and footing setout

Assessment

Quiz

Professional Development

University

Practice Problem

Medium

Created by

Chris Ho

Used 5+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is steel usually combined with concrete?

To reduce cost

To increase flexibility

To enhance strength and durability

To improve appearance

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is a characteristic of aluminum that makes it effective against elements that wear other metals?

High density

High thermal conductivity

Corrosion resistance

High melting point

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is the first step in setting up a site according to project plans and specifications?

Testing the soil and structural engineering assessments

Demolishing any existing structures

Clearing the land

Installing retaining walls if they’re needed

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the process of marking the position, shape, and size of a building on a construction site called?

Building layout

Building set-out

Building design

Building planning

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who provides the details that are transferred to the ground during the building set-out process?

The contractor and engineer

The architect and surveyor

The builder and inspector

The client and designer

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What can errors made during the building set-out result in?

Increased project speed

Future costly alterations

Improved building design

Reduced construction costs

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be done if the boundary pegs are missing?

Ignore the issue and proceed with construction

Use approximate measurements

Employ a licensed surveyor to replace them

Consult with the project manager

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?