Maintenance of Roads and Bridges, Project Quality Assurance DPWH

Maintenance of Roads and Bridges, Project Quality Assurance DPWH

Professional Development

10 Qs

quiz-placeholder

Similar activities

PROJECT MANAGEMENT

PROJECT MANAGEMENT

Professional Development

14 Qs

LABORATORY TECHNICIAN COURSE 2024

LABORATORY TECHNICIAN COURSE 2024

Professional Development

10 Qs

FMEA Day 2 of 3

FMEA Day 2 of 3

Professional Development

9 Qs

Understanding GRIHA 2019 Standards

Understanding GRIHA 2019 Standards

Professional Development

10 Qs

CIMS - PART 3

CIMS - PART 3

Professional Development

15 Qs

Automotive Core Tool Questionaries'

Automotive Core Tool Questionaries'

Professional Development

10 Qs

Understanding KPIs and Departments

Understanding KPIs and Departments

Professional Development

10 Qs

Understanding MRI Technology

Understanding MRI Technology

Professional Development

10 Qs

Maintenance of Roads and Bridges, Project Quality Assurance DPWH

Maintenance of Roads and Bridges, Project Quality Assurance DPWH

Assessment

Quiz

Engineering

Professional Development

Hard

Created by

Dave Lumbay

Used 7+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Under Road and Bridge Defects, What is the description for Code 12?

Cracks

Ravelling

Clogged Drains

Open Manhole

2.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Response time for Code 12 - Cracks?

7 days

10 days

3 days

15 days

3.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Defined as the standard of something as measured against other things of a similar kind.

Standard

Sampling

Quality

Assurance

4.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Inspections, sampling and testing undertaken by the Contractor.

Quality Assurance

Quality Control

Quality Manipulation

Quality Certification

5.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

The final arbiter in the resolution of disputes between DPWH and the Contractor.

Bureau of Quality and Safety

Bureau of Construction

Bureau of Fire Protection

Bureau of Research and Standards

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The method used to address a problem or nonconformance to get the root cause, for it to be eliminated, thus, preventing the problem / nonconformance from recurring.

Root Cause Design

Root Cause Dialysis

Root Cause Analysis

Root Cause Experiment

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The following are the situations where the Root Cause Analysis is required, except:

Deficiencies of 10% or more of the required thickness, width, length and volume of an item of work

Minor Defects amounting to 75% of the pay item involve

Serious Defects affecting 25% of the pay item involve

Very Serious defects affecting 10% of the pay item involve

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?